STOP AND START SYSTEM(for 3ZR-FAE) Starter Signal Circuit
| DTC Code | DTC Name |
|---|---|
| Starter Signal Circuit |
DESCRIPTION
for CVT:
By using the starter delay circuit, the engine stop and start ECU can activate the ST NO. 2 relay (for starter motor operation) after activating the ST NO. 1 relay (for starter pinion operation) to operate the starter assembly.
for Manual Transaxle:
The engine stop and start ECU can activate the ST NO. 1 relay to operate the starter assembly.
WIRING DIAGRAM
for CVT:
for Manual Transaxle:
CAUTION / NOTICE / HINT
for CVT:
When replacing the engine stop and start ECU with a new one, make sure to download the previous status (number of starter operations) of the old engine stop and start ECU. After replacing the engine stop and start ECU, turn the ignition switch to ON and wait 20 seconds, then confirm that "OK" is displayed for the Data List item "Oper Prohibition (O/P Air Bleeding)". Then upload the previous status (number of starter operations) to the engine stop and start ECU.
for Manual Transaxle:
Before replacing the engine stop and start ECU, read the number of starter operations and write it into a new engine stop and start ECU.
After replacing the engine stop and start ECU or air conditioning amplifier assembly, reset and perform learning of the air conditioning information in the engine stop and start ECU.
After replacing the engine stop and start ECU or airbag sensor assembly, clear and calibrate the deceleration sensor zero point in the engine stop and start ECU.
After replacing the starter assembly, perform initialization of the number of starter operations stored in the engine stop and start ECU.
for CVT:
When the starter assembly is replaced, "ST NO. 1 relay" and "ST NO. 2 relay" must be also replaced.
for Manual Transaxle:
When the starter assembly is replaced, "ST NO. 1 relay" must be also replaced.
Inspect the fuses for circuits related to this system before performing the following procedure.
PROCEDURE
CHECK CRANKING
Turn the ignition switch to START and check that the engine cranks.
Result
Result
Proceed to
Engine cranks
A
Engine does not crank
B
B PERFORM ACTIVE TEST USING GTS (STARTER)Click here
PERFORM ACTIVE TEST USING GTS (STARTER)
Connect the GTS to the DLC3.
Turn the ignition switch to ON.
Turn the GTS on.
Enter the following menus: Powertrain / Stop and Start / Active Test / Starter.
Powertrain > Stop and Start > Active Test
Tester Display
Starter
Check whether the engine cranks while the Active Test "Starter" is being performed.
Note:The Active Test "Starter" is stopped automatically 3 seconds after the starter assembly begins operating.
Standard
Engine cranks
Result
Proceed to
OK
NG
CHECK HARNESS AND CONNECTOR (ENGINE STOP AND START ECU POWER SOURCE CIRCUIT)
*a
Front view of wire harness connector
(to Engine Stop and Start ECU)
-
-
Disconnect the engine stop and start ECU connectors.
Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection
Condition
Specified Condition
A86-1 (BIN2) - Body ground
Always
9.5 to 14 V
A86-3 (BIN1) - Body ground
Always
9.5 to 14 V
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection
Condition
Specified Condition
A66-1 (+B) - Body ground
Ignition switch ON
9.5 to 14 V
G87-18 (IG2) - Body ground
Ignition switch ON
9.5 to 14 V
G87-21 (IG1) - Body ground
Ignition switch ON
9.5 to 14 V
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
CHECK HARNESS AND CONNECTOR (ENGINE STOP AND START ECU - BODY GROUND)
Disconnect the A86 and A66 engine stop and start ECU connectors.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
A86-2 (GND2) - Body ground
Always
Below 1 Ω
A86-8 (GND1) - Body ground
Always
Below 1 Ω
A66-6 (DGND) - Body ground
Always
Below 1 Ω
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
PERFORM ACTIVE TEST USING GTS (STARTER)
Connect the GTS to the DLC3.
Turn the ignition switch to ON.
Turn the GTS on.
Enter the following menus: Powertrain / Stop and Start / Active Test / Starter.
Powertrain > Stop and Start > Active Test
Tester Display
Starter
Check whether the engine cranks while the Active Test "Starter" is being performed.
Note:The Active Test "Starter" is stopped automatically 3 seconds after the starter assembly begins operating.
Standard
Engine cranks
Result
Result
Proceed to
Engine cranks (for CVT)
A
Engine does not crank (for CVT)
B
Engine cranks (for Manual Transaxle)
C
Engine does not crank (for Manual Transaxle)
D
B CHECK ENGINE STOP AND START ECU (STA, STA2 SIGNAL)Click here
C READ VALUE USING GTS (CLUTCH LOWER SW)Click here
D CHECK HARNESS AND CONNECTOR (ST NO. 1 RELAY - BODY GROUND)Click here
READ VALUE USING GTS (NEUTRAL SWITCH)
Connect the GTS to the DLC3.
Turn the ignition switch to ON.
Turn the GTS on.
Enter the following menus: Powertrain / Stop and Start / Data List / Neutral Switch.
In accordance with the display on the GTS, read the Data List.
Powertrain > Stop and Start > Data List
Tester Display
Neutral Switch
OK
Tester Display
Condition
Normal Condition
Neutral Switch
Shift lever in P or N
ON
Shift lever not in P or N
OFF
Result
Result
Proceed to
OK (w/ Entry and Start System)
A
OK (w/o Entry and Start System)
B
NG
C
B INSPECT IGNITION OR STARTER SWITCH ASSEMBLYClick here
C INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLYClick here
CHECK HARNESS AND CONNECTOR (CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) - ENGINE STOP AND START ECU)
Disconnect the G82 certification ECU (smart key ECU assembly) connector.
Disconnect the A66 engine stop and start ECU connector.
Disconnect the B36 park/neutral position switch assembly connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
G82-5 (STAR) - A66-17 (CLL)
Always
Below 1 Ω
G82-5 (STAR) - Body ground
Always
10 kΩ or higher
A66-17 (CLL) - Body ground
Always
10 kΩ or higher
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
CHECK CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) (STAR SIGNAL)
-
*a
Front view of wire harness connector
(to Engine Stop and Start ECU)
Disconnect the engine stop and start ECU connector.
Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection
Condition
Specified Condition
A66-17 (CLL) - Body ground
Engine started using push start switch assembly (ignition switch turned START)
9.5 to 14 V
Result
Proceed to
OK
NG
-
INSPECT IGNITION OR STARTER SWITCH ASSEMBLY
Inspect the ignition or starter switch assembly.
Result
Proceed to
OK
NG
CHECK HARNESS AND CONNECTOR (IGNITION OR STARTER SWITCH ASSEMBLY - BATTERY)
-
*a
Front view of wire harness connector:
(to Ignition or Starter Switch Assembly)
Disconnect the ignition or starter switch assembly connector.
Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection
Condition
Specified Condition
G4-4 (AM2) - Body ground
Always
11 to 14 V
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
-
CHECK HARNESS AND CONNECTOR (IGNITION OR STARTER SWITCH ASSEMBLY - PARK/NEUTRAL POSITION SWITCH ASSEMBLY)
Disconnect the G4 ignition or starter switch assembly connector.
Disconnect the B36 park/neutral position switch assembly connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
G4-2 (ST2) - B36-4 (B)
Always
Below 1 Ω
G4-2 (ST2) - Body ground
Always
10 kΩ or higher
B36-4 (B) - Body ground
Always
10 kΩ or higher
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
Inspect the park/neutral position switch assembly.
Result
Result
Proceed to
OK (w/ Entry and Start System)
A
OK (w/o Entry and Start System)
B
NG
C
B CHECK HARNESS AND CONNECTOR (IGNITION OR STARTER SWITCH ASSEMBLY - ST NO. 1 RELAY)Click here
CHECK HARNESS AND CONNECTOR (CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) - ST NO. 1 RELAY)
Disconnect the G82 certification ECU (smart key ECU assembly) connector.
Remove the ST NO. 1 relay from the No. 2 engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
G82-5 (STAR) - ST NO. 1 relay terminal 2
Shift lever in P or N
Below 1 Ω
Shift lever not in P or N
10 kΩ or higher
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
CHECK HARNESS AND CONNECTOR (IGNITION OR STARTER SWITCH ASSEMBLY - ST NO. 1 RELAY)
Disconnect the G4 ignition or starter switch assembly connector.
Remove the ST NO. 1 relay from the No. 2 engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
G4-2 (ST2) - ST NO. 1 relay terminal 2
Shift lever in P or N
Below 1 Ω
Shift lever not in P or N
10 kΩ or higher
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
CHECK ENGINE STOP AND START ECU (STA, STA2 SIGNAL)
*a
Component with harness connected
(Engine Stop and Start ECU)
-
-
Connect an oscilloscope to the A66-21 (STA), A66-23 (STA2) and A66-6 (DGND) terminals of the engine stop and start ECU connector.
-
Check the waveform immediately after turning the ignition switch START.
Item
Condition
Tester Connection
A66-21 (STA) - A66-6 (DGND)
A66-23 (STA2) - A66-6 (DGND)
Condition
Engine started by ignition or starter switch assembly*1 or push start switch assembly*2 operation
*1: w/o Entry and Start System
*2: w/ Entry and Start System
Result
Result
Proceed to
Delay between ST NO. 1 relay turning on and ST NO. 2 relay turning on: between 0.03 and 0.06 seconds
A
Delay between ST NO. 1 relay turning on and ST NO. 2 relay turning on: not between 0.03 and 0.06 seconds
B
ST NO. 1 relay turns on and ST NO. 2 relay does not turn on
C
ST NO. 1 relay and ST NO. 2 relay do not turn on
D
Note:After replacing the engine stop and start ECU, make sure that the drive plate and ring gear sub-assembly and starter pinion gear are not excessively worn. A malfunction in the delay circuit may cause the drive plate and ring gear sub-assembly or starter pinion gear to be worn or damaged.
C CHECK HARNESS AND CONNECTOR (ENGINE STOP AND START ECU POWER SOURCE CIRCUIT)Click here
D CHECK HARNESS AND CONNECTOR (ST NO. 1 RELAY - BODY GROUND)Click here
INSPECT RELAY (ST NO. 1, ST NO. 2 RELAY)
Inspect the ST NO. 1 relay.
Inspect the ST NO. 2 relay.
Result
Proceed to
OK
NG
NG REPLACE RELAY (ST NO. 1, ST NO. 2 RELAY)
CHECK HARNESS AND CONNECTOR (ST NO. 1, ST NO. 2 RELAY - BATTERY)
*1
No. 2 Engine Room Relay Block and Junction Block Assembly
*a
ST NO. 1 Relay Terminal
*b
ST NO. 2 Relay Terminal
Remove the ST NO. 1 and ST NO. 2 relay from the No. 2 engine room relay block and junction block assembly.
Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection
Condition
Specified Condition
ST NO. 1 relay terminal 5 - Body ground
Always
9.5 to 14 V
ST NO. 2 relay terminal 5 - Body ground
Always
9.5 to 14 V
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
CHECK HARNESS AND CONNECTOR (ST NO. 1, ST NO. 2 RELAY - STARTER ASSEMBLY)
Remove the ST NO. 1 and ST NO. 2 relay from the No. 2 engine room relay block and junction block assembly.
Disconnect the B87 starter assembly connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
ST NO. 1 relay terminal 3 - B87-2 (SL1)
Always
Below 1 Ω
ST NO. 2 relay terminal 3 - B87-1 (SL2)
Always
Below 1 Ω
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
CHECK HARNESS AND CONNECTOR (ST NO. 1 RELAY - BODY GROUND)
Remove the ST NO. 1 relay from the No. 2 engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
ST NO. 1 relay terminal 1 - Body ground
Always
Below 1 Ω
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
CHECK HARNESS AND CONNECTOR (ST NO. 2 RELAY - BODY GROUND)
Remove the ST NO. 2 relay from the No. 2 engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
ST NO. 2 relay terminal 1 - Body ground
Always
Below 1 Ω
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
CHECK HARNESS AND CONNECTOR (ENGINE STOP AND START ECU - ST NO. 1 RELAY)
Disconnect the A66 engine stop and start ECU connector.
Remove the ST NO. 1 relay from the No. 2 engine room relay block and junction block assembly.
w/ Entry and Start System:
Disconnect the G82 certification ECU (smart key ECU assembly) connector.
Disconnect the B36 park/neutral position switch assembly connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
A66-21 (STA) - ST NO. 1 relay terminal 2
Always
Below 1 Ω
A66-21 (STA) - Body ground
Always
10 kΩ or higher
ST NO. 1 relay terminal 2 - Body ground
Always
10 kΩ or higher
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
CHECK HARNESS AND CONNECTOR (ENGINE STOP AND START ECU - ST NO. 2 RELAY)
Disconnect the A66 engine stop and start ECU connector.
Remove the ST NO. 2 relay from the No. 2 engine room relay block and junction block assembly.
Disconnect the A62 ECM connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
A66-23 (STA2) - ST NO. 2 relay terminal 2
Always
Below 1 Ω
A66-23 (STA2) - Body ground
Always
10 kΩ or higher
ST NO. 2 relay terminal 2 - Body ground
Always
10 kΩ or higher
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
CHECK STARTER SIGNAL (OUTPUT WAVEFORM)
Enter the following menus: Powertrain / Stop and Start / Active Test / Starter Motor Drive Magnet Switch.
Connect the positive (+) lead of an oscilloscope to the positive (+) battery terminal and the negative (-) lead to the negative (-) battery terminal.
While performing the Active Test "Starter Motor Drive Magnet Switch" to forcibly operate the starter motor, count the number of times the waveform drops.
Note:The Active Test "Starter Motor Drive Magnet Switch" is stopped automatically after the starter motor operates for 3 seconds.
Do not forcibly operate the starter pinion.
Standard
Waveform drops 2 times
Result
Number of Times Waveform Dropped
Proceed to
0 times
A
2 times
B
B INSPECT STARTER ASSEMBLYClick here
INSPECT STARTER INRUSH CURRENT REDUCTION RELAY
-
*1
Starter Assembly
*a
B Terminal
*b
M Terminal
Disconnect the cable from the negative (-) battery terminal.
Disconnect terminals B and M of the starter inrush current reduction relay.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
B Terminal - M Terminal
Always
Below 1 Ω
Result
Proceed to
OK
NG
NG INSPECT STARTER ASSEMBLY (M TERMINAL)Click here
-
INSPECT STARTER ASSEMBLY (C TERMINAL)
Disconnect the cable from the negative (-) battery terminal.
-
*1
Starter Assembly
*a
Inspect Part
*b
C Terminal
*c
B Terminal
Disconnect terminal B of the starter inrush current reduction relay.
Disconnect terminal C of the starter assembly.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
C Terminal - B Terminal
Always
Below 1 Ω
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
INSPECT STARTER ASSEMBLY (M TERMINAL)
Disconnect the cable from the negative (-) battery terminal.
-
*1
Starter Assembly
*a
Inspect Part
*b
M Terminal
Disconnect terminal M of the starter inrush current reduction relay.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
M Terminal - Body ground
Always
Below 1 Ω
Result
Proceed to
OK
NG
INSPECT STARTER ASSEMBLY
Inspect the starter assembly.
Result
Proceed to
OK
NG
CHECK HARNESS AND CONNECTOR (ENGINE STOP AND START ECU POWER SOURCE CIRCUIT)
*a
Front view of wire harness connector
(to Engine Stop and Start ECU)
-
-
Disconnect the engine stop and start ECU connectors.
Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection
Condition
Specified Condition
A86-1 (BIN2) - Body ground
Always
9.5 to 14 V
A86-3 (BIN1) - Body ground
Always
9.5 to 14 V
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection
Condition
Specified Condition
A66-1 (+B) - Body ground
Ignition switch ON
9.5 to 14 V
G87-18 (IG2) - Body ground
Ignition switch ON
9.5 to 14 V
G87-21 (IG1) - Body ground
Ignition switch ON
9.5 to 14 V
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
CHECK HARNESS AND CONNECTOR (ENGINE STOP AND START ECU - BODY GROUND)
Disconnect the A86 and A66 engine stop and start ECU connectors.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
A86-2 (GND2) - Body ground
Always
Below 1 Ω
A86-8 (GND1) - Body ground
Always
Below 1 Ω
A66-6 (DGND) - Body ground
Always
Below 1 Ω
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
READ VALUE USING GTS (CLUTCH LOWER SW)
Connect the GTS to the DLC3.
Turn the ignition switch to ON.
Turn the GTS on.
Enter the following menus: Powertrain / Stop and Start / Data List / Clutch Lower SW
In accordance with the display on the GTS, read the Data List.
Powertrain > Stop and Start > Data List
Tester Display
Clutch Lower SW
OK
Tester Display
Condition
Normal Condition
Clutch Lower SW
Fully Depressed
ON
Fully Released
OFF
Result
Result
Proceed to
Data Monitor display is not within standards
A
Data Monitor display is within standards (w/o Entry and Start System)
B
Data Monitor display is within standards (w/ Entry and Start System)
C
B INSPECT IGNITION OR STARTER SWITCH ASSEMBLYClick here
C CHECK HARNESS AND CONNECTOR (CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) - ENGINE STOP AND START ECU)Click here
INSPECT CLUTCH START SWITCH ASSEMBLY (FOR LOWER)
Inspect the clutch start switch assembly (for lower).
Result
Result
Proceed to
OK (w/o Smart Entry and Start System)
A
OK (w/ Smart Entry and Start System)
B
NG
C
B CHECK HARNESS AND CONNECTOR (CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) - ST NO. 1 RELAY)Click here
CHECK HARNESS AND CONNECTOR (IGNITION OR STARTER SWITCH ASSEMBLY - ST NO. 1 RELAY)
Disconnect the A66 engine stop and start ECU connectors.
Disconnect the G4 ignition or starter switch assembly connector.
Remove the ST NO. 1 relay from the No. 2 engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
G4-2 (ST2) - ST NO. 1 relay terminal 2
Fully Depressed
Below 1 Ω
Fully Released
10 kΩ or higher
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
CHECK HARNESS AND CONNECTOR (CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) - ST NO. 1 RELAY)
Disconnect the G82 certification ECU (smart key ECU assembly) connector.
Remove the ST NO. 1 relay from the No. 2 engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
G82-5 (STAR) - ST NO. 1 relay terminal 2
Fully Depressed
Below 1 Ω
Fully Released
10 kΩ or higher
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
INSPECT IGNITION OR STARTER SWITCH ASSEMBLY
Inspect the ignition or starter switch assembly.
Result
Proceed to
OK
NG
CHECK HARNESS AND CONNECTOR (IGNITION OR STARTER SWITCH ASSEMBLY - BATTERY)
Disconnect the G4 ignition or starter switch assembly connector.
-
*a
Front view of wire harness connector
(to Ignition or Starter Switch Assembly)
Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection
Condition
Specified Condition
G4-4 (AM2) - Body ground
Always
9.5 to 14 V
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
CHECK HARNESS AND CONNECTOR (IGNITION OR STARTER SWITCH ASSEMBLY - CLUTCH START SWITCH ASSEMBLY (FOR LOW))
Disconnect the G4 ignition or starter switch assembly connector.
Disconnect the A66 engine stop and start ECU connector.
Disconnect the A4 clutch start switch assembly (for low) connector.
Disconnect the A62 ECM connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
G4-2 (ST2) - A4-2
Always
Below 1 Ω
G4-2 (ST2) - Body ground
Always
10 kΩ or higher
A4-2 - Body ground
Always
10 kΩ or higher
A66-17 (CLL) - Body ground
Always
10 kΩ or higher
A62-23 (NSW) - Body ground
Always
10 kΩ or higher
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
CHECK HARNESS AND CONNECTOR (CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) - ENGINE STOP AND START ECU)
Disconnect the A4 clutch start switch assembly (for low) connector.
Disconnect the G82 certification ECU (smart key ECU assembly) connector.
Disconnect the A66 engine stop and start ECU connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
G82-5 (STAR) - A66-17 (CLL)
Always
Below 1 Ω
G82-5 (STAR) - Body ground
Always
10 kΩ or higher
A66-17 (CLL) - Body ground
Always
10 kΩ or higher
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
CHECK CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) (STAR SIGNAL)
-
*a
Front view of wire harness connector
(to Engine Stop and Start ECU)
Disconnect the engine stop and start ECU connector.
Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection
Condition
Specified Condition
A66-17 (CLL) - Body ground
Engine started using push start switch assembly (ignition switch turned START)
9.5 to 14 V
Result
Proceed to
OK
NG
-
CHECK HARNESS AND CONNECTOR (ST NO. 1 RELAY - BODY GROUND)
Remove the ST NO. 1 relay from the No. 2 engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
ST NO. 1 relay terminal 2 - Body ground
Always
Below 1 Ω
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
CHECK HARNESS AND CONNECTOR (ENGINE STOP AND START ECU - ST NO. 1 RELAY)
w/ Entry and Start System:
Disconnect the G82 certification ECU (smart key ECU assembly) connector.
Disconnect the A4 clutch start switch assembly (for lower) connector.
Disconnect the A66 engine stop and start ECU connector.
Remove the ST NO. 1 relay from the No. 2 engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
A66-21 (STA) - ST NO. 1 relay terminal 2
Always
Below 1 Ω
A66-21 (STA) - Body ground
Always
10 kΩ or higher
ST NO. 1 relay terminal 2 - Body ground
Always
10 kΩ or higher
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
INSPECT STARTER ASSEMBLY
Inspect the starter assembly.
Result
Proceed to
OK
NG