PROCEDURE
INSTALL HEADUP DISPLAY SWITCH ASSEMBLY
Engage the 4 claws to install the headup display switch assembly.
INSTALL NO. 1 INSTRUMENT PANEL REGISTER ASSEMBLY
INSTALL UPPER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY
INSTALL LOWER INSTRUMENT PANEL FINISH PANEL ASSEMBLY
INSTALL UPPER INSTRUMENT PANEL FINISH PANEL
INSTALL INTEGRATION CONTROL AND PANEL
CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.
INSTALL DECK FLOOR BOX RH
INSTALL REAR DECK FLOOR BOX
INSTALL NO. 1 DECK BOARD
INSTALL NO. 2 DECK BOARD
INSTALL DECK BOARD ASSEMBLY