INTEGRATION RELAY INSTALLATION

PROCEDURE


  1. INSTALL NO. 1 INTEGRATION RELAY


    1. Connect the 3 connectors.

    2. A005C2Z

      Engage the 2 claws to install the No. 1 integration relay as shown in the illustration.

  2. INSTALL NO. 1 RELAY BLOCK COVER


    1. A005EDW

      Engage the 3 claws to install the No. 1 relay block cover as shown in the illustration.

  3. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  4. INSTALL DECK FLOOR BOX RH

    Click here

  5. INSTALL REAR DECK FLOOR BOX

    Click here

  6. INSTALL NO. 1 DECK BOARD

    Click here

  7. INSTALL NO. 2 DECK BOARD

    Click here

  8. INSTALL DECK BOARD ASSEMBLY

    Click here