PARK / NEUTRAL POSITION SWITCH INSTALLATION
PROCEDURE
INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
Install the park/neutral position switch assembly to the continuously variable transaxle assembly.
-
Temporarily install the 2 bolts.
-
Install a new lock plate and the lock nut to the park/neutral position switch assembly.
6.9 N*m
70 kgf*cm
61 in.*lbf
Temporarily install the control shaft lever.
-
Turn the lever clockwise until it stops, and then turn it counterclockwise 2 notches.
Remove the control shaft lever.
-
*a
Neutral Basic Line
*b
Protrusion
Align the protrusion with the neutral basic line.
Hold the switch in that position and tighten the 2 bolts.
5.4 N*m
55 kgf*cm
48 in.*lbf
-
Using a screwdriver, bend the tabs of the lock plate.
Install the control shaft lever with the washer and nut.
13 N*m
133 kgf*cm
10 ft.*lbf
Connect the park/neutral position switch connector.
CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
Connect the transmission control cable assembly to the control shaft lever with the nut.
12 N*m
122 kgf*cm
9 ft.*lbf
INSPECT SHIFT LEVER POSITION
ADJUST SHIFT LEVER POSITION
INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
INSTALL NO. 1 ENGINE UNDER COVER
for 3ZR-FE:
for 3ZR-FAE: