POWER MANAGEMENT CONTROL ECU INSTALLATION

PROCEDURE


  1. INSTALL POWER MANAGEMENT CONTROL ECU


    1. for LHD:


      1. A005ETM

        Engage the 2 claws to install the power management control ECU as shown in the illustration.

    2. for RHD:


      1. A005D06

        Engage the 2 claws to install the power management control ECU as shown in the illustration.

  2. INSTALL ECU INTEGRATION BOX RH (for LHD)


    1. Install the ECU integration box RH with the bolt and 2 nuts.

      Torque:
      Bolt
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
      Nut
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
    2. Engage the 3 clamps.

    3. Connect each connector.

  3. INSTALL ECU INTEGRATION BOX LH (for RHD)


    1. Install the ECU integration box LH with the bolt and nut.

      Torque:
      Bolt
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
      Nut
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
    2. Engage the clamp.

    3. Connect each connector.

  4. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY

    Click here

  5. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

    Click here

  6. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  7. INSTALL DECK FLOOR BOX RH

    Click here

  8. INSTALL REAR DECK FLOOR BOX

    Click here

  9. INSTALL NO. 1 DECK BOARD

    Click here

  10. INSTALL NO. 2 DECK BOARD

    Click here

  11. INSTALL DECK BOARD ASSEMBLY

    Click here