FRONT PROPELLER SHAFT ASSEMBLY (for TSAM Made) REASSEMBLY


  1. INSTALL UNIVERSAL JOINT SPIDER ASSEMBLY

    A01DXCGE01

    1. Apply MP grease to a new spider and 2 new spider bearings.

    2. Fit the spider into the flange yoke.

    3. A01DW4NE01

      Using SST, install the 2 spider bearings to the spider.

      SST
      09332-25010
    4. A01E1I1E01

      Using SST, adjust the spider bearings so that: 1) the flange yoke does not overlap the snap ring grooves of the spider bearings, and the grooves are as wide as possible; and 2) the groove width on both sides is the same.

      SST
      09332-25010
    5. Install 2 new snap rings to the installed spider bearings. The snap rings must have equal thickness which will allow 0 to 0.05 mm (0 to 0.0020 in.) of axial play.

      Standard snap ring thickness
      Part No. Thickness Color
      90080-52174 1.38 mm (0.0543 in.) Green
      90080-52044 1.384 mm (0.0545 in.) Green
      90080-52043 1.435 mm (0.0565 in.) Red
      90080-52175 1.45 mm (0.0571 in.) Orange
      90080-52176 1.48 mm (0.0583 in.) Black
      90080-52041 1.486 mm (0.0585 in.) Black
      90080-52176 1.48 mm (0.0583 in.) Black
      90080-52042 1.511 mm (0.0595 in.) Copper
      90080-52040 1.537 mm (0.0605 in.) Silver
      90080-52178 1.54 mm (0.0606 in.) Yellow
      90080-52039 1.588 mm (0.0625 in.) Yellow
      90080-52179 1.63 mm (0.0642 in.) Red
      90080-52038 1.638 mm (0.0645 in.) Blue
      90080-52180 1.68 mm (0.0661 in.) Blue

      Note


      • New snap rings must be used.

      • The snap ring thickness must be the same on both ends.

    6. A01E13GE01

      Using a hammer, tap the flange yoke until there is no clearance between the spider bearings and snap rings.

    7. Align the matchmarks on the flange yoke and sleeve yoke.

    8. Install new spider bearings on the sleeve yoke side.

      Tech Tips

      Use the procedures described above.

      Tech Tips

      Perform the installation of the other universal joint spider using the same procedures.

  2. INSPECT UNIVERSAL JOINT SPIDER ASSEMBLY


    1. Check the spider bearings for wear or damage.

    2. Check each spider bearing's axial play by turning the yoke while holding the shaft tightly.

      Maximum bearing axial play
      0.05 mm (0.0020 in.)

      If the axial play is greater than the maximum, replace the spider bearing.

  3. INSTALL SLIDING SHAFT BOOT


    1. Temporarily install the boot (with 2 new clamps) to the propeller shaft.

    2. Mount the propeller shaft in a soft vise.

    3. Coat the splines of the propeller shaft with MP grease.

    4. Align the matchmarks on the propeller shaft and sleeve yoke.

    5. Install the sleeve yoke to the propeller shaft and connect the boot.

    6. A01DWW3E01

      Secure one of the boot clamps onto the boot.


      1. Place SST onto the boot clamp.

        SST
        09521-24010
      2. Tighten SST so that the boot clamp is pinched as shown in the illustration.

        Note

        Do not overtighten SST.

      3. A01E1AOE01

        Using SST, adjust the clearance of the boot clamp.

        SST
        09240-00020
        Standard clearance
        0.8 mm (0.031 in.) or less
    7. For the remaining boot clamp, use the same procedures described above.

  4. INSPECT PROPELLER SHAFT GREASE FITTING DIRECTION

    Tech Tips

    When replacing a spider bearing, be sure that the grease fitting hole is facing the direction shown in the illustration.

    A01E0F8E01