CONDENSER FAN INSPECTION
PROCEDURE
INSPECT SHROUD BLOWER ASSEMBLY
Apply battery voltage and check the operation of the shroud blower as shown in the table.
OK
Measurement Condition
Specified Condition
Battery positive (+) → Terminal 1
Battery negative (-) → Terminal 2
Shroud blower operates smoothly
If the result is not as specified, replace the shroud blower assembly.