DESCRIPTION
The ABS main relay supplies power to the changeover solenoid and the linear solenoid.
The ABS main relay remains on for approximately 2 minutes after the power switch is turned off and the input of brake pedal operation signals stops, and supplies power to the system to keep it ready to operate.
| DTC No. | INF Code | DTC Detection Condition | Trouble Area |
|---|---|---|---|
| C1311/11 | 1 | Either of the following is detected:
|
|
| C1312/12 | 2 | The ABS main relay contact is turned ON (BS terminal voltage 3.5 V or more) for 4.5 seconds or more when ABS main relay OFF is requested from the ECU. |
|
WIRING DIAGRAM
Refer to DTCs C1241/41 and C1242/42 Click here.
INSPECTION PROCEDURE
Note
When replacing the skid control ECU (brake booster with master cylinder assembly), perform initialization and calibration of the linear solenoid valve Click here.
PROCEDURE
PERFORM ACTIVE TEST USING TECHSTREAM (ABS MAIN RELAY)
Connect the Techstream to the DLC3.
Turn the power switch on (IG).
Select the Active Test on the Techstream Click here.
| Tester Display | Test Part | Control Range | Diagnostic Note |
|---|---|---|---|
| ECB* Main Relay | ABS main relay | Relay ON/OFF | - |
*: Electronically Controlled Brake System
Select the Data List on the Techstream Click here.
| Tester Display | Measurement Item/Range | Normal Condition | Diagnostic Note |
|---|---|---|---|
| ECB* Main Relay | ABS main relay / ON or OFF | ON: Relay on OFF: Relay off |
- |
*: Electronically Controlled Brake System
Check that the condition of the ABS main relay observed on the Techstream changes according to tester operation.
| Result | ||||||
|---|---|---|---|---|---|---|
|
| B |
|
CHECK HARNESS AND CONNECTOR (BI TERMINAL) Click here |
| A |
|
CHECK HARNESS AND CONNECTOR (BS TERMINAL)
Turn the power switch off.
Make sure that there is no looseness at the locking part and the connecting part of the connector.
Disconnect the skid control ECU (brake booster with master cylinder assembly) connector.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| *a | Front view of wire harness connector (to Skid Control ECU (Brake Booster with Master Cylinder Assembly)) |
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (BS CIRCUIT) |
| OK |
|
RECONFIRM DTC
Reconnect the skid control ECU (brake booster with master cylinder assembly) connector.
Clear the DTCs Click here.
Turn the power switch on (IG).
Check if the same DTC is output Click here.
| Result | ||||||
|---|---|---|---|---|---|---|
|
| B |
|
REPLACE BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY Click here |
| A |
|
CHECK FOR INTERMITTENT PROBLEMS Click here
CHECK HARNESS AND CONNECTOR (BI TERMINAL)
Turn the power switch off.
Check that the ABS NO. 1 (30 A) and ABS NO. 2 (7.5 A) fuses are normal.
Make sure that there is no looseness at the locking part and the connecting part of the connector.
Disconnect the skid control ECU (brake booster with master cylinder assembly) connector.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| *a | Front view of wire harness connector (to Skid Control ECU (Brake Booster with Master Cylinder Assembly)) |
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (BI CIRCUIT) |
| OK |
|
CHECK HARNESS AND CONNECTOR (BS TERMINAL)
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| *a | Front view of wire harness connector (to Skid Control ECU (Brake Booster with Master Cylinder Assembly)) |
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (BS CIRCUIT) |
| OK |
|
REPLACE BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY Click here