INSTALL SHIFT LEVER SUPPORT
Install the shift lever support with the 4 bolts in the sequence shown in the illustration.
INSTALL LOWER SHIFT LEVER ASSEMBLY
Note
Check that the park/neutral position switch and the shift lever are in neutral.
Install the lower shift lever assembly with the 4 bolts in the sequence shown in the illustration.
Connect the 3 clamps and connector.
Slide the slider of the transmission control cable in the direction indicated by the arrow and pull the lock piece outward.
| *1 | Slider |
| *2 | Lock Piece |
| *a | Slide |
| *b | Pull |
Install the end of the transmission control cable to the shift lever assembly.
| *1 | Lock Piece |
Note
Check that the lock piece is pulled up.
Install the cable end all the way to the base of the pin.
Push the lock piece into the adjuster case.
Note
Check that the park/neutral position switch and the shift lever are in neutral.
Securely push in the lock piece until the slider lock is engaged.
INSTALL NO. 1 CONSOLE BOX DUCT
Install the No. 1 console box duct to the lower shift lever assembly with the clip.
INSTALL NO. 1 CONSOLE BOX MOUNTING BRACKET
Install the No. 1 console box mounting bracket to the lower shift lever assembly with the screw.
INSTALL FLOOR CARPET BRACKET LH
Engage the 2 guides.
Install the floor carpet bracket LH with the 2 clips.
INSTALL CONSOLE BOX INSERT
Engage the clip and 3 guides.
Install the console box insert with the 2 screws <D> or <E>.
INSTALL FRONT NO. 2 CONSOLE BOX INSERT
Engage the 2 claws to connect the room temperature sensor.
Engage the clip and 3 guides.
Install the front No. 2 console box insert with the 2 screws <D> or <E>.
INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY
Connect each connector.
Engage the 4 clips and guide.
Install the upper console panel sub-assembly with the 2 screws <D> or <E>.
INSTALL BOX BOTTOM MAT
Install the box bottom mat.
INSTALL LOWER INSTRUMENT PANEL SUB-ASSEMBLY
Connect each connector.
Engage the glove compartment light as shown in the illustration.
Engage the 3 guides and 2 clips.
Install the lower instrument panel sub-assembly with the 5 screws <D> or <E>.
INSTALL LOWER NO. 2 INSTRUMENT PANEL AIRBAG ASSEMBLY
Check that the power switch is off.
Check that the cable is disconnected from the negative (-) auxiliary battery terminal.
CAUTION:
Wait at least 90 seconds after disconnecting the cable from the negative (-) auxiliary battery terminal to disable the SRS system.
Connect the airbag connector to the lower No. 2 instrument panel airbag assembly.
Note
When connecting any airbag connector, take care not to damage the airbag wire harness.
| *1 | Airbag Connector |
| *2 | Airbag Connector Lock |
Push in the lock to install the airbag connector.
Temporarily install the lower No. 2 instrument panel airbag assembly with the 3 claws.
Install the 3 bolts.
Note
Confirm that the lower No. 2 instrument panel airbag assembly is installed securely without any excessive gaps and is not protruding outward.
INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Connect the connector.
Engage the 2 guides and 4 claws to install the No. 2 instrument panel under cover sub-assembly.
INSTALL INSTRUMENT SIDE PANEL RH
Engage the 3 guides.
Engage the 4 claws to install the instrument side panel RH as shown in the illustration.
INSTALL FRONT DOOR OPENING TRIM WEATHERSTRIP RH
Align the alignment mark (White) on the weatherstrip with the protruding portion on the body indicated by the arrow in the illustration, and install the front door opening trim weatherstrip RH.
| *1 | Alignment Mark (White) |
Note
After installation, check that the corners fit correctly.
INSTALL COWL SIDE TRIM SUB-ASSEMBLY RH
Tech Tips
Use the same procedure as for the LH side.
INSTALL FRONT DOOR SCUFF PLATE RH
Tech Tips
Use the same procedure as for the LH side.
INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL ASSEMBLY
Engage the 4 claws, 9 clips and 3 guides.
Install the lower No. 1 instrument panel finish panel assembly with the bolt <C> and screw <D> or <E>.
CONNECT HOOD LOCK CONTROL LEVER SUB-ASSEMBLY
Engage the claw and 2 guides to connect the hood lock control lever sub-assembly.
INSTALL INSTRUMENT SIDE PANEL LH
Engage the 3 guides.
Engage the 4 claws to install the instrument side panel LH as shown in the illustration.
INSTALL FRONT DOOR OPENING TRIM WEATHERSTRIP LH
Align the alignment mark (Yellow) on the weatherstrip with the protruding portion on the body indicated by the arrow in the illustration, and install the front door opening trim weatherstrip LH.
| *1 | Alignment Mark (Yellow) |
Note
After installation, check that the corners fit correctly.
INSTALL COWL SIDE TRIM SUB-ASSEMBLY LH
Insert the 2 clips in the direction indicated by the arrows shown in the illustration to engage them.
Install the cowl side trim sub-assembly LH with the clip.
INSTALL FRONT DOOR SCUFF PLATE LH
Engage the 10 claws to install the front door scuff plate LH.
INSTALL REAR CONSOLE BOX ASSEMBLY
INSPECT SHIFT LEVER POSITION
While moving the shift lever from the N position to each position, check that the lever moves smoothly and that the shift position indicator comes on properly according to the shift lever position.
Put the vehicle into the READY-on state and check the following:
When the shift lever is moved to the D position, the vehicle moves forward.
When the shift lever is moved to the R position, the vehicle moves in reverse.
Note
The vehicle should not move when the shift position indicator is off.
CONNECT CABLE TO AUXILIARY BATTERY NEGATIVE TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.
INSTALL LUGGAGE TRIM SERVICE HOLE COVER
Engage the claw to connect the luggage trim service hole cover.
PERFORM DIAGNOSTIC SYSTEM CHECK
INSPECT SRS WARNING LIGHT