GENERATOR CABLE INSTALLATION

  1. INSTALL GENERATOR CABLE

    1. Install the generator cable to the hybrid vehicle transaxle assembly with 4 new bolts.

      Torque:
      8.5 N*m  { 87 kgf*cm, 75 in.*lbf }
  2. INSTALL INVERTER TRAY BRACKET SUB-ASSEMBLY

    1. Temporarily install the inverter tray bracket sub-assembly to the body with the 4 bolts.

      A011WS0E01

      Tech Tips

      Temporarily tighten bolt 1.

    2. Install the 4 bolts in the order shown in the illustration.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
  3. INSTALL INVERTER WITH CONVERTER ASSEMBLY

    Click here