CANISTER INSPECTION

  1. INSPECT CHARCOAL CANISTER ASSEMBLY

    1. Visually check the charcoal canister assembly.

      1. Visually check the charcoal canister assembly for cracks or damage.

        A011XSL

        If cracks or damage are found, replace the charcoal canister assembly.

    2. Check canister operation.

      1. With port C closed, blow 5 kPa (0.1 kgf/cm2, 0.7 psi) of air into port A, and check that air flows from port B.

        A011Y5DE01
        Text in Illustration
        *a Air

        If the result is not as specified, replace the charcoal canister assembly.

      2. With port A closed, blow 5 kPa (0.1 kgf/cm2, 0.7 psi) of air into port B, and check that air flows from port C.

        A011XHHE01
        Text in Illustration
        *a Air

        If the result is not as specified, replace the charcoal canister assembly.

    3. Check for air leaks.

      1. Connect a pressure gauge to port A of the charcoal canister assembly.

        A011X9VE01
        Text in Illustration
        *1 Pressure Gauge
      2. With port C and port B closed, apply 20 kPa (150 mmHg, 5.91 in.Hg) of pressurized air into port A, then confirm that pressure is retained for 1 minute.

        If the result is not as specified, replace the charcoal canister assembly.

  2. INSPECT NO. 1 CHARCOAL CANISTER FILTER

    1. Visually check the No. 1 charcoal canister filter.

      1. Visually check the No. 1 charcoal canister filter for cracks or damage.

        A011WVD

        If cracks or damage are found, replace the No. 1 charcoal canister filter.

    2. Check canister operation.

      1. Blow 5 kPa (0.1 kgf/cm2, 0.7 psi) of air into port A, and check that air flows from port B.

        A011XXBE01
        Text in Illustration
        *a Air

        If the result is not as specified, replace the No. 1 charcoal canister filter.

    3. Check for air leaks.

      1. Connect a pressure gauge to port A of the No. 1 charcoal canister filter.

        A011YVJE01
        Text in Illustration
        *1 Pressure Gauge
      2. With port B closed, apply 20 kPa (150 mmHg, 5.91 in.Hg) of pressurized air into port A, then confirm that pressure is retained for 1 minute.

        If the result is not as specified, replace the No. 1 charcoal canister filter.

    4. Check the charcoal canister leak detection pump sub-assembly.

      1. Connect a positive (+) lead from the auxiliary battery to terminal 5 and a negative (-) lead to terminal 1.

        A011XE2
      2. Check that a clicking sound is heard from the leak detection pump.

        If the result is not as specified, replace the charcoal canister leak detection pump sub-assembly.