QUARTER PANEL CUT AND JOIN REPLACEMENT SECTIONS (SMALL AREAS)

A00YIMN

  1. REMOVAL

    Symbol Meaning
    A00YIJD Remove Weld Points
    A00YIQB Cut and Join Location
    A00YINZ Cut Location for Supply Parts
    A00YILME01
  2. INSTALLATION

    Symbol Meaning
    A00YIJ3 Plug Weld
    A00YIQ8 Butt Weld
    A00YIM6 Body Sealer

      INSTALLATION POINT

    1. Inspect the fitting of the related parts around the new parts before welding. This affects the appearance of the finish.

    2. Temporarily install the new parts and measure each part of the new parts in accordance with the body dimension diagram. (See the body dimensions)

    3. Before installing a new part, apply body sealer.

      Tech Tips

      Apply body sealer in an even, continuous bead.

    4. After welding, apply foamed sealing material to the corresponding parts. (See the painting / coating)

    5. After welding, apply body sealer to the corresponding parts. (See the painting / coating)

    6. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed section structural weld points.

    A00YIMTE01