QUARTER PANEL(for 5 Door) ASSEMBLY REPLACEMENT

A002JF6

  1. REMOVAL

    Symbol Meaning
    B001C30 Remove Weld Points
    B001C6C Cut with Disc Sander etc.
    B001C6F Cut Location for Supply Parts
    A002JNF
    A002JH5C02
    *A LH *B RH
  2. INSTALLATION

    Symbol Meaning
    B001C44 Spot Weld
    B001C57 Plug Weld
    B001C5R Butt Weld
    B001C5F Body Sealer

      INSTALLATION POINT

    1. Inspect the fitting of the related parts around the new parts before welding. This affects the appearance of the finish.

    2. Temporarily install the new parts and measure each part of the new parts in accordance with the body dimension diagram. (See the body dimensions)

    3. Before installing a new part, apply body sealer.

      Tech Tips

      Apply body sealer evenly about 5 mm (0.20 in.) from the flange, avoiding any oozing.

      Apply body sealer evenly, about 3 to 4 mm (0.12 to 0.16 in.) in diameter.

    4. After welding, apply the foamed sealing material to the corresponding parts. (See the painting / coating)

    5. After welding, apply body sealer to the corresponding parts. (See the painting / coating)

    6. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed section structural weld points.

    A002JDEC02
    *A LH *B RH
    *1 Rivets *2 Fuel Filler Opening Lid
    *a mm (in.) - -
    A002JD6C02
    *A LH *B RH