FRONT DRIVE SHAFT ASSEMBLY (for 1ZR-FAE, 2ZR-FAE) INSTALLATION


  1. INSTALL FRONT DRIVE SHAFT ASSEMBLY LH


    1. Coat the spline of the inboard joint shaft with oil.

      Tech Tips

      Be sure to use the same type of oil that is used for the transaxle.

    2. A01IRIQ

      Align the shaft splines and tap in the drive shaft with a brass bar and hammer.

      Note


      • Make sure that the snap ring opening is facing downwards when installing the drive shaft.

      • Be careful not to damage the oil seal, boot or dust cover.

  2. INSTALL FRONT DRIVE SHAFT ASSEMBLY RH

    Tech Tips

    Use the same procedures described for the LH side.

  3. ADD MANUAL TRANSAXLE OIL

    Click here

  4. ADD CONTINUOUSLY VARIABLE TRANSAXLE FLUID

    Click here

  5. INSTALL OIL LEAK

  6. INSTALL NO. 1 ENGINE UNDER COVER


    1. A01ISXU

      Install the under cover with the 11 clips and 6 bolts.

  7. CLEAN DRIVE SHAFT AND AXLE SHAFT NUT


    1. Clean the threaded parts on the drive shaft and a new axle shaft nut using a non-residue solvent.

      Note


      • Be sure to perform this work for a new drive shaft.

      • Keep the threaded parts free of oil and foreign objects.

  8. INSTALL FRONT AXLE ASSEMBLY LH

    Click here

  9. INSTALL FRONT AXLE ASSEMBLY RH

    Tech Tips

    Use the same procedures described for the LH side.