TRANSMISSION CONTROL CABLE INSTALLATION


  1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY


    1. A01IQR5

      Attach the grommet of the control cable assembly with the 2 nuts.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    2. A01IOFU

      Attach the bracket of the control cable assembly with the bolt.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    3. A01IRNL

      Connect the 2 cables to the control cable bracket with 2 new clips.

    4. A01IOZW

      Connect the 2 cables to the transaxle and install the 2 clips.

    5. A01IS3A

      Engage the 2 claws, and install the control cable assembly to the shift lever assembly.

      Note

      Make sure that the claws are firmly engaged.

    6. A01IQBRE01
      Text in Illustration
      *1 Select Cable

      Install the control shift cable to the shift lever assembly.

    7. A01INGTE02

      Release the lock of the cable length adjustment structure of the select cable.


      1. Turn the stopper.

      2. A01IOTDE02

        Pull the lock piece outward from the case to release the lock.

      3. A01IS8RE01

        Return the stopper.

    8. A01IR15E01
      Text in Illustration
      *1 Reverse Restrict Pin Assembly
      *2 Outer Lever

      Hook the outer lever of the manual transaxle onto the reverse restrict pin assembly to secure it.

    9. A01IQCHE02

      Connect the control select cable to the shift lever assembly.

    10. Push the slider against the inhibitor wall.

      Note


      • Do not pull up the slider.

      • When adjusting the cable, make sure that the shift lever is not in the 1 or 2.

    11. Lock the cable length adjustment structure of the select cable.


      1. Turn the stopper.*1

      2. Push the lock piece into the case.*2

      3. Return the stopper to prevent the lock from being released.*3

        Note


        • Push the lock piece as far as it will go.

        • Confirm whether the cable length adjustment structure is locked securely.

    12. A01IS1EE01

      Move the shift lever to R to release the outer lever.

  2. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR

    A01IT4Y

    1. Install the front No. 1 floor heat insulator with the 3 nuts.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
  3. INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL

    A01IPGW

    1. Attach the 4 clips to install the lower No. 1 instrument panel finish panel.

    2. Connect the connector.

    3. Install the screw <D>.

  4. INSTALL FRONT NO. 2 CONSOLE BOX INSERT


    1. Attach the 3 claws and guide to install the front No. 2 console box insert.

      A01IQC5E01
  5. INSTALL FRONT NO. 1 CONSOLE BOX INSERT


    1. Attach the 3 claws and guide to install the front No. 1 console box insert.

      A01IUSGE01
  6. INSTALL LOWER CENTER INSTRUMENT PANEL FINISH PANEL

    A01IOQT

    1. for Automatic Air Conditioning System:


      1. Attach the 2 claws, 4 clips and 5 guides to install the lower center instrument panel finish panel.

      2. Install the 2 screws <C>.

    2. A01IQS2

      for Manual Air Conditioning System:


      1. Attach the 4 clips, 2 claws and 5 guides to install the lower center instrument panel finish panel.

      2. Install the 2 screws <C>.

  7. INSTALL SHIFTING HOLE COVER

    A01INHVE01
    Text in Illustration
    *1 T Washer

    1. Attach the 5 claws and 3 clips to install the shifting hole cover.

    2. Install the knob spring.

    3. Install the T washer and twist it in the direction indicated by the arrow.

  8. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY


    1. Install the shift lever knob and twist it in the direction indicated by the arrow.

      A01IQX6E01
  9. INSTALL STEREO OPENING COVER WITH BRACKET (w/o Audio)

    A01ISEY

    1. Install the stereo opening cover with the 4 bolts.

  10. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (w/o Audio)

    A01IRZ3

    1. Attach the 4 clips, 3 claws and 3 guides to install the center instrument cluster finish panel.

  11. INSTALL RADIO RECEIVER ASSEMBLY (w/ Audio)


    1. for Radio Receiver Type:

      Install the radio receiver assembly Click here.

    2. for Radio and Display Type:

      Install the radio receiver assembly Click here.

  12. INSTALL CENTER INSTRUMENT PANEL REGISTER ASSEMBLY

    A01IQZA

    1. Connect the connector.

    2. Attach the 8 claws and 4 guides to install the center instrument panel register.

  13. INSTALL INSTRUMENT PANEL FINISH PANEL END RH

    A01IRVW

    1. for Automatic Air Conditioning System:

      Attach the 3 clips, claw and 2 guides to install the instrument panel finish panel end.

    2. A01ISYI

      for Manual Air Conditioning System:

      Attach the 3 clips, claw and guide to install the instrument panel finish panel end.

  14. INSTALL INSTRUMENT PANEL FINISH PANEL END LH

    A01IS29

    1. for Automatic Air Conditioning System:

      Attach the 3 clips and 2 guides to install the instrument panel finish panel end.

    2. A01INF5

      for Manual Air Conditioning System:

      Attach the 3 clips and guide to install the instrument panel finish panel end.

  15. INSTALL BOX PANEL SUB-ASSEMBLY


    1. Install the box panel sub-assembly Click here.

  16. INSTALL AIR CLEANER CASE


    1. A01IQF0

      Install the air cleaner case with the 3 bolts.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
    2. Attach the wire harness clamp to the air cleaner case.

  17. INSTALL AIR CLEANER CAP SUB-ASSEMBLY


    1. A01IPUC

      Connect the air cleaner cap with the band.

    2. Connect the PCV hose.

    3. A01IP4V

      Connect the 2 clamps.

    4. A01ISEG

      Attach the 2 clamps and connect the wire harness.

    5. Connect the mass air flow meter connector.

  18. INSTALL BATTERY CARRIER


    1. A01IN2I

      Install the battery carrier with the 4 bolts.

      Torque:
      19 N*m  { 189 kgf*cm, 14 ft.*lbf }
    2. A01INC1

      Install the radiator pipe with the 2 bolts.

      Torque:
      19 N*m  { 189 kgf*cm, 14 ft.*lbf }
    3. Connect the 2 wire harness clamps.

  19. INSTALL BATTERY TRAY

  20. INSTALL BATTERY

  21. INSTALL BATTERY CLAMP SUB-ASSEMBLY


    1. A01IQN6E01

      Install the battery clamp with the bolt and nut.

      Torque:
      for bolt
      17 N*m  { 169 kgf*cm, 12 ft.*lbf }
      for nut
      3.5 N*m  { 36 kgf*cm, 31 in.*lbf }
    2. Connect the cable to the positive (+) battery terminal.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
  22. INSTALL RADIATOR SUPPORT OPENING COVER


    1. A01IU5G

      Attach the 4 hooks to install the radiator support opening cover.

    2. Install the 5 clips.

  23. INSTALL NO. 2 CYLINDER HEAD COVER


    1. A01IRS7

      Attach the 4 clips to install the cover.

      Note


      • Be sure to attach the clips securely.

      • Do not apply excessive force or hit the cover to attach the clips. This may cause the cover to break.

  24. CONNECT CABLE TO POSITIVE BATTERY TERMINAL

  25. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  26. INSTALL BATTERY SERVICE HOLE COVER


    1. A01IPWV

      Install the battery service hole cover with the clip.

  27. INSTALL FRONT EXHAUST PIPE ASSEMBLY


    1. Install the front exhaust pipe assembly Click here.