FUEL INJECTOR INSTALLATION

Note


  • Always be sure to check the tightening torque.

  • If the pressure lines are leaking after installation, they must be replaced.

  • Do not overtighten the pressure lines.

Tech Tips

Perform "Inspection After Repairs" after replacing the fuel injector assembly Click here.


  1. INSTALL INJECTOR ASSEMBLY

    Note


    • Before installing the injector assembly, check for carbon, foreign matter, etc. on the seal surfaces of the cylinder head sub-assembly and injector assembly. If there is foreign matter, remove it before installing the injector assembly.

    • A01IN8HE01

      Make sure to replace the copper sealing ring on the injector assembly.

      Text in Illustration
      *1 Copper Sealing Ring
      *a Point Above the Copper Sealing Ring
      *b Injector Assembly Slot End
    • Before installing the injector assemblies to the injector assembly slots, apply a light coat of highly heat-resistant grease from above the top of the copper sealing ring to the injector assembly slot end.

    • Check the installation position of the high pressure connection.

    • Make sure to read the adjustment values each time new injector assemblies are installed.

    Tech Tips

    Perform "Inspection After Repairs" after replacing the fuel injector assembly Click here.


    1. Install the 4 injector assemblies to the cylinder head cover sub-assembly.

    2. Using an E10 "TORX" socket wrench, install the 4 clamping claws to the 4 injector assemblies with the 4 centering rings and 4 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }

      Note


      • Retighten the clamping claw (cylinder head cover mounting).

      • Make sure the screw centering ring is correctly positioned in order to align the clamping claw.

    3. Connect the 4 injector assembly connectors.

  2. CONNECT NOZZLE LEAKAGE PIPE ASSEMBLY


    1. Install 4 new sealing rings to the nozzle leakage pipe assembly.

    2. A01IQ9VE01
      Text in Illustration
      *1 Sealing Ring
      *2 Leakage Line
      *3 Clip
      *a Push Down

      Connect the nozzle leakage pipe assembly to the 4 injector assemblies and push down the 4 clips to install the nozzle leakage pipe assembly.

    3. A01IQZ7

      Connect the connector and attach the 2 clamps to connect the wire harness.

  3. INSTALL CAMSHAFT POSITION SENSOR


    1. Apply a light coat of engine oil to the O-ring of the camshaft position sensor.

      Note


      • When reusing the camshaft position sensor, inspect the O-ring.

      • Make sure that the O-ring is not cracked or jammed when installing the camshaft position sensor.

    2. Using an E6 "TORX" socket wrench, install the camshaft position sensor with the bolt.

      Torque:
      3.6 N*m  { 37 kgf*cm, 32 in.*lbf }
    3. Connect the camshaft position sensor connector.

  4. INSTALL INJECTION PIPE SUB-ASSEMBLY

    Note


    • If the pressure lines are leaking after installation, they must be replaced.

    • Do not overtighten the pressure lines.


    1. Temporarily install the 2 No. 1 injection pipe sub-assemblies and 2 No. 2 injection pipe sub-assemblies at the common rail assembly end by hand.

    2. A01INZYE01

      Using a SST, tighten the 4 union nuts at the common rail assembly end of the 2 No. 1 injection pipe sub-assemblies and 2 No. 2 injection pipe sub-assemblies as shown in the illustration.

      SST
      PZ4TB-04959-10
      Torque:
      24 N*m  { 245 kgf*cm, 18 ft.*lbf }

      Note

      Reset SST in a timely manner to prevent bending of pressure lines.

    3. Using SST, tighten the 4 union nuts at the 4 injector assembly ends of the 2 No. 1 injection pipe sub-assemblies and 2 No. 2 injection pipe sub-assemblies.

      SST
      PZ4TB-04959-10
      Torque:
      24 N*m  { 245 kgf*cm, 18 ft.*lbf }

      Note

      Reset SST in a timely manner to prevent bending of pressure lines.

    4. Check all components of the common rail system for tightness.

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  6. PERFORM REGISTRATION


    1. Perform registration of injector compensation codes Click here.

  7. INSTALL ENGINE COVER

  8. INSTALL NO. 1 ENGINE COVER


    1. A01IQK8E02
      Text in Illustration
      *a Installation Points

      Attach the 4 clips to install the No. 1 engine cover.

      Tech Tips

      When attaching the clips, press the protrusions on the top of the No. 1 engine cover at the clip installation points.

  9. INSPECT FOR FUEL LEAK


    1. Check fuel pump operation.


      1. Connect the GTS to the DLC3.

      2. Turn the ignition switch to ON and turn the GTS on.

        Note

        Do not start the engine.

      3. Enter the following menus: Powertrain / Engine and ECT / Active Test / Actuator Test of FPC (EU5).

      4. Check for pressure in the fuel inlet tube from the fuel line. Check that sounds of fuel flowing from the fuel tank can be heard. If no sounds can be heard, check the No. 1 integration relay, fuel suction with pump and gauge tube assembly, ECM and wiring connectors.

    2. Inspect for fuel leaks.


      1. Check that there are no fuel leaks from the fuel system after doing any maintenance or repairs. If there is a fuel leak, repair or replace parts as necessary.

    3. Turn the ignition switch off.

    4. Disconnect the GTS from the DLC3.