DESCRIPTION
The fuel injector assemblies are located on the intake manifold. They inject fuel into the cylinders based on the signals from the ECM.
WIRING DIAGRAM
INSPECTION PROCEDURE
Note
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
PROCEDURE
CHECK FUEL INJECTOR ASSEMBLY (POWER SOURCE)
| *a | Front view of wire harness connector (to Fuel Injector Assembly) |
Disconnect the fuel injector assembly connectors.
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Reconnect the fuel injector assembly connectors.
| NG |
|
CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY - FUEL INJECTOR ASSEMBLY) Click here |
| OK |
|
INSPECT FUEL INJECTOR ASSEMBLY
Inspect the fuel injector assembly Click here.
Tech Tips
Perform "Inspection After Repair" after replacing the fuel injector assembly Click here.
| NG |
|
REPLACE FUEL INJECTOR ASSEMBLY Click here |
| OK |
|
CHECK HARNESS AND CONNECTOR (FUEL INJECTOR ASSEMBLY - ECM)
Disconnect the fuel injector assembly connectors.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Standard Resistance (Check for Short) | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Reconnect the fuel injector assembly connectors.
Reconnect the ECM connector.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (FUEL INJECTOR ASSEMBLY - ECM) |
| OK |
|
REPLACE ECM Click here
CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY - FUEL INJECTOR ASSEMBLY)
Disconnect the fuel injector assembly connectors.
Remove the integration relay from the engine room No. 1 relay block.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Standard Resistance (Check for Short) | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Reinstall the integration relay.
Reconnect the fuel injector assembly connector.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (INTEGRATION RELAY - FUEL INJECTOR ASSEMBLY) |
| OK |
|
INSPECT INTEGRATION RELAY (IGT/INJ RELAY)
Inspect the IGT/INJ relay Click here.
| NG |
|
REPLACE INTEGRATION RELAY |
| OK |
|
CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY - INTEGRATION RELAY)
Remove the integration relay from the engine room No. 1 relay block.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | ||||||
|---|---|---|---|---|---|---|
|
| Standard Resistance (Check for Short) | ||||||
|---|---|---|---|---|---|---|
|
Reconnect the integration relay connector.
Reinstall the integration relay.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (INTEGRATION RELAY - INTEGRATION RELAY) |
| OK |
|
CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY - BODY GROUND)
Remove the integration relay from the engine room No. 1 relay block.
Disconnect the integration relay connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | ||||||
|---|---|---|---|---|---|---|
|
Reconnect the integration relay connector.
Reinstall the integration relay.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (INTEGRATION RELAY - BODY GROUND) |
| OK |
|
GO TO ECM POWER SOURCE CIRCUIT Click here