INTEGRATION RELAY INSTALLATION


  1. INSTALL ENGINE ROOM JUNCTION BLOCK ASSEMBLY


    1. A01NMP4

      Connect the 3 connectors.

    2. A01NIB5

      Engage the 2 claws to install the engine room junction block assembly as shown in the illustration.

  2. INSTALL NO. 1 RELAY BLOCK COVER


    1. A01NI2A

      Engage the 4 claws to install the lower No. 1 relay block cover.

    2. A01NIG7

      Engage the 3 claws to install the upper No. 1 relay block cover.

  3. CONNECT RELAY BLOCK


    1. A01NLXD

      Engage the claw and connect the relay block as shown in the illustration.

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  5. INSTALL REAR DECK FLOOR BOX


    1. A01NIBL

      Install the rear deck floor box with the 3 clips.

  6. INSPECT SRS WARNING LIGHT


    1. Inspect the SRS warning light Click here.