PNEUMATIC TANK INSTALLATION


  1. CONNECT NO. 1 HEIGHT CONTROL TUBE


    1. Coat 2 new O-rings with MP grease No. 2.

    2. Install the new O-rings to the No. 1 height control tube.

    3. A01NL23

      Install the No. 1 height control tube to the pneumatic tank sub-assembly.

      Tech Tips

      For the connecting procedure of the tube (type 3), refer to Precaution of the suspension control system Click here.

    4. Lock the 2 holders.

  2. INSTALL PNEUMATIC TANK WITH TUBE ASSEMBLY


    1. A01NKRK

      Temporarily install the pneumatic tank with tube assembly brackets to the 2 clamps.

    2. A01NLS0

      Install the pneumatic tank with tube assembly with the 2 bolts.

      Torque:
      29 N*m  { 296 kgf*cm, 21 ft.*lbf }
    3. Engage the height control tube to the clamp.

    4. Coat 2 new O-rings with MP grease No. 2.

    5. Install the new O-rings and a new plate to the pneumatic tank with tube assembly.

    6. A01NIAY

      Install the height control tube to the pneumatic tank with tube assembly.

      Tech Tips

      For the connecting procedure of the tube (type 2), refer to Precaution of the suspension control system Click here.

    7. A01NJ4T

      Connect the connector.

  3. INSTALL ENGINE SERVICE COVER STAY


    1. A01NI4HE01

      Install the engine service cover stay with the 3 bolts.

      Torque:
      Bolt (A)
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
      Bolt (B)
      29 N*m  { 296 kgf*cm, 21 ft.*lbf }

      Note

      Tighten the 2 bolts (A) first, and then the bolt (B).

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  5. INSTALL REAR DECK FLOOR BOX


    1. A01NIBL

      Install the rear deck floor box with the 3 clips.

  6. PERFORM INITIALIZATION


    1. Perform initialization Click here.

  7. INSPECT FOR AIR LEAK


    1. Inspect for air leaks Click here.

  8. INSTALL FRONT FLOOR COVER RH