ROOF DRIP SIDE FINISH MOULDING INSTALLATION


  1. INSTALL ROOF DRIP SIDE FINISH MOULDING CLIP (except Glass Roof)

    Note


    • If reusing the clips, do not remove the double-sided tape remaining on the clips and where the clips will be installed on the body.

    • If installing new clips, remove the double-sided tape remaining where the clips will be installed on the body and clean the body with a non-residue solvent.


    1. A019JMLE01

      Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to new roof drip side finish moulding clips.

      Tech Tips

      Adhesive strength (tensile strength): 13.7 MPa (140 kgf/cm2) or more (when the temperature is 23°C (73°F))

    2. Press and install the 3 roof drip side finish moulding clips.

    3. A019M01E01
      Text in Illustration
      *1 Protruding Part

      Install the clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 3 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent).

      Standard Dimension
      Installation Area Dimension Measurement
      for Front Side A 5.0 mm (0.197 in.)
      B 5.7mm (0.224 in.)
      for Center Side A 5.2 mm (0.205 in.)
      B 7.0 mm (0.276 in.)
      for Rear Side A 5.0 mm (0.197 in.)
      B 5.8 mm (0.228 in.)
    4. Install the roof drip center side finish moulding when 20 minutes or more have elapsed after pressing and installing the 3 roof drip side finish moulding clips.

      Tech Tips


      • Initial hardening time: 20 minutes

      • Complete hardening time: 48 hours

  2. INSTALL ROOF DRIP SIDE FINISH MOULDING CLIP (for Glass Roof)

    Note


    • If reusing the clips, do not remove the double-sided tape remaining on the clips and where the clips will be installed on the body.

    • If installing new clips, remove the double-sided tape remaining where the clips will be installed on the body and clean the body with a non-residue solvent.


    1. A019JMLE01

      Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to new roof drip side finish moulding clips.

      Tech Tips

      Adhesive strength (tensile strength): 13.7 MPa (140 kgf/cm2) or more (when the temperature is 23°C (73°F))

    2. Press and install the 2 roof drip side finish moulding clips.

    3. A019M01E01
      Text in Illustration
      *1 Protruding Part

      Install the clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent).

      Standard Dimension
      Installation Area Dimension Measurement
      for Front Side A 8.0 mm (0.315 in.)
      B 6.0mm (0.236 in.)
      for Rear Side A 5.0 mm (0.197 in.)
      B 5.8 mm (0.228 in.)
    4. Install the roof drip center side finish moulding when 20 minutes or more have elapsed after pressing and installing the 2 roof drip side finish moulding clips.

      Tech Tips


      • Initial hardening time: 20 minutes

      • Complete hardening time: 48 hours

  3. INSTALL REAR ROOF RACK BRACKET (w/o Roof Rack)


    1. A019OHGE01

      Install a new center rear roof rack bracket with 2 new bolts as shown in the illustration.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  4. INSTALL FRONT ROOF RACK BRACKET (w/o Roof Rack)

    Tech Tips

    Use the same procedure for the front side and rear side.

  5. INSTALL ROOF DRIP SIDE FINISH MOULDING (except Glass Roof)


    1. A019K1A

      Engage the clip and install the roof drip side finish moulding.

  6. INSTALL CENTER ROOF DRIP SIDE FINISH MOULDING (except Glass Roof)


    1. A019LDY

      Engage the clip and install the center roof drip side finish moulding.

  7. INSTALL REAR ROOF DRIP SIDE FINISH MOULDING


    1. A019KY3

      Engage the clip and install the rear roof drip side finish moulding.

  8. INSTALL ROOF DRIP SIDE FINISH MOULDING (for Glass Roof)


    1. A019OJK

      Engage the clip and install the roof drip side finish moulding.

  9. INSTALL REAR ROOF DRIP SIDE MOULDING COVER (w/o Roof Rack)


    1. A019K1DE01

      Engage the clip and claw, and install the rear roof drip side moulding cover as shown in the illustration.

  10. INSTALL FRONT ROOF DRIP SIDE MOULDING COVER (w/o Roof Rack)

    Tech Tips

    Use the same procedure for the front side and rear side.

  11. INSTALL ROOF CARRIER SEAL (w/ Roof Rack)


    1. A019O3M

      Install a new roof carrier seal.

      Tech Tips

      Use the same procedure for the front side and rear side.

  12. INSTALL ROOF RACK ASSEMBLY (w/ Roof Rack)


    1. Install the roof rack assembly with 4 new bolts.

      A019KRG
      Torque:
      34 N*m  { 347 kgf*cm, 25 ft.*lbf }
  13. INSTALL REAR ROOF RACK LEG COVER (w/ Roof Rack)


    1. Engage the guide and 3 claws, and install the rear roof rack leg cover.

      A019P7A
  14. INSTALL FRONT ROOF RACK LEG COVER (w/ Roof Rack)


    1. Engage the guide and 3 claws, and install the front roof rack leg cover.

      A019M6N