AFS ECU INSTALLATION


  1. INSTALL AFS ECU (for LHD)


    1. A019K2F

      Engage the guide.

    2. Install the AFS ECU with the nut.

    3. Connect the connector.

  2. INSTALL AFS ECU (for RHD)


    1. A019OYC

      Engage the guide.

    2. Install the AFS ECU with the nut.

    3. Connect the connector.

  3. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for LHD)


    1. Engage each clamp.

    2. Connect each connector.

    3. A019OY6

      Engage the claw and 2 guides.

    4. Install the No. 1 instrument panel under cover sub- assembly with the 2 screws <D>.

  4. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for RHD)


    1. Engage each clamp.

    2. Connect each connector.

    3. A019OCA

      Engage the claw and 2 guides.

    4. Install the No. 1 instrument panel under cover sub- assembly with the 2 screws <D>.

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  6. CHECK VEHICLE HEIGHT (w/ Air Suspension)


    1. Change the height control switch from the "NORM" position to the "HIGH" position and back to the "NORM" position.

    2. Measure the vehicle height Click here.

  7. ADJUST VEHICLE HEIGHT (w/ Air Suspension)


    1. Adjust the vehicle height Click here.

  8. REGISTER VEHICLE INFORMATION

    Click here

  9. HEIGHT CONTROL SENSOR SIGNAL INITIALIZATION (w/o Air Suspension)

    Click here

  10. ADJUST HEADLIGHT AIMING

    Click here