GENERATOR INSTALLATION


  1. INSTALL GENERATOR ASSEMBLY


    1. A019LIQ

      Install the generator with the 2 bolts.

      Torque:
      52 N*m  { 530 kgf*cm, 38 ft.*lbf }
    2. A019JY8

      Install the wire harness clamp bracket with the bolt.

      Torque:
      8.4 N*m  { 86 kgf*cm, 74 in.*lbf }
    3. Connect the generator wire with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    4. Install the terminal cap.

    5. Connect the generator connector.

    6. Connect the wire harness clamp.

  2. INSTALL V-RIBBED BELT


    1. Install the belt Click here.

  3. INSTALL COOL AIR INTAKE DUCT SEAL


    1. Install the cool air intake duct seal with the 6 clips.

  4. INSTALL ENGINE ROOM SIDE COVER


    1. Engage the guide.

    2. Install the engine room side cover with the 4 clips.

  5. INSTALL ENGINE ROOM SIDE COVER LH


    1. Engage the guide.

    2. Install the engine room side cover LH with the 4 clips.

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.