CONTROL VALVE ASSEMBLY (for Rear Side) INSTALLATION


  1. INSTALL NO. 2 HEIGHT CONTROL VALVE SUB-ASSEMBLY


    1. Coat 6 new O-rings with MP grease No. 2.

    2. Install 6 new O-rings and 3 plates to the No. 2 height control valve sub-assembly.

    3. A019PJ5

      Install the No. 2 height control valve sub-assembly with the 2 nuts.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    4. A019KY5

      Connect the 3 height control tubes.

      Tech Tips

      For the connecting procedure of the tube (type 2), refer to Precaution of Suspension Control System Click here.

    5. A019M9Y

      Connect the connector.

  2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  3. INSPECT FOR AIR LEAK


    1. Inspect for air leaks Click here.

  4. PERFORM INITIALIZATION


    1. Perform initialization Click here.

      Note

      Some systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.