INSTALL NO. 2 HEIGHT CONTROL VALVE SUB-ASSEMBLY
Coat 6 new O-rings with MP grease No. 2.
Install 6 new O-rings and 3 plates to the No. 2 height control valve sub-assembly.
Install the No. 2 height control valve sub-assembly with the 2 nuts.
Connect the 3 height control tubes.
Tech Tips
For the connecting procedure of the tube (type 2), refer to Precaution of Suspension Control System Click here.
Connect the connector.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.
INSPECT FOR AIR LEAK
Inspect for air leaks Click here.
PERFORM INITIALIZATION
Perform initialization Click here.
Note
Some systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.