PNEUMATIC TANK INSTALLATION


  1. CONNECT NO. 1 HEIGHT CONTROL TUBE


    1. Coat 2 new O-rings with MP grease No. 2.

    2. Install 2 new O-rings to the No. 1 height control tube.

    3. A019NX9

      Install the No. 1 height control tube to the pneumatic tank sub-assembly.

      Tech Tips

      For the connecting procedure of the tube (type 3), refer to Precaution of Suspension Control System Click here.

    4. Lock the 2 holders.

  2. INSTALL PNEUMATIC TANK WITH TUBE ASSEMBLY


    1. A019P3F

      Temporarily install the pneumatic tank with tube assembly brackets to the 2 clamps.

    2. A019NZO

      Install the pneumatic tank with tube assembly with the 2 bolts.

      Torque:
      29 N*m  { 296 kgf*cm, 21 ft.*lbf }
    3. Engage the height control tube to the clamp.

    4. Coat 2 new O-rings with MP grease No. 2.

    5. Install 2 new O-rings and a new plate to the pneumatic tank with tube assembly.

    6. A019MA6

      Install the height control tube to the pneumatic tank with tube assembly.

      Tech Tips

      For the connecting procedure of the tube (type 2), refer to Precaution of Suspension Control System Click here.

    7. A019OS4

      Connect the connector.

  3. INSTALL ENGINE SERVICE COVER STAY


    1. A019JOFE01

      Install the engine service cover stay with the 3 bolts.

      Torque:
      Bolt (A)
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
      Bolt (B)
      29 N*m  { 296 kgf*cm, 21 ft.*lbf }

      Note

      Tighten the 2 bolts (A) first, and then the bolt (B).

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  5. PERFORM INITIALIZATION


    1. Perform initialization Click here.

      Note

      Some systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.

  6. INSPECT FOR AIR LEAK


    1. Inspect for air leaks Click here.

  7. INSTALL FRONT FLOOR COVER RH