CAMSHAFT INSTALLATION


  1. INSTALL NO. 3 CAMSHAFT


    1. Apply a light coat of engine oil to the No. 3 camshaft journals and camshaft housing sub-assembly LH.

    2. Install the No. 3 camshaft to the camshaft housing sub-assembly LH.

  2. INSTALL NO. 4 CAMSHAFT


    1. Apply a light coat of engine oil to the No. 4 camshaft journals and camshaft housing sub-assembly LH.

    2. Install the No. 4 camshaft to the camshaft housing sub-assembly LH.

  3. INSTALL CAMSHAFT BEARING CAP (for Bank 2)


    1. Apply engine oil to the camshaft bearing caps.

    2. A019KCK

      Make sure of the marks and numbers on the camshaft bearing caps and place them in each proper position and direction.

    3. A019JOHE01

      Temporarily tighten the 8 bolts in the order shown in the illustration.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  4. INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY LH


    1. A019LN3E06
      Text in Illustration
      *1 Valve Rocker Arm
      *2 Lash Adjuster
      *3 Valve Stem
      *4 Valve Stem Cap

      Make sure that the valve rocker arm is installed as shown in the illustration.

    2. A019KJME07

      Apply seal packing in a continuous line as shown in the illustration.

      Seal packing
      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
      Standard seal diameter
      3.5 to 4.5 mm (0.138 to 0.177 in.)

      Note


      • Remove any oil from the contact surface.

      • Install the camshaft housing sub-assembly LH within 3 minutes.

      • Do not start the engine for at least 2 hours after installing.

    3. A019OD8E01

      Install the camshaft housing sub-assembly LH and tighten the 13 bolts in the order shown in the illustration.

      Torque:
      28 N*m  { 286 kgf*cm, 21 ft.*lbf }

      Note


      • When installing the camshaft housing sub-assembly LH, it is necessary to correctly position the camshafts as shown in the illustration. Failure to correctly position these parts may result in damage due to contact between the pistons and valves. If a camshaft is rotated with a piston at TDC, valve contact will occur.

      • If any of the bolts are loosened during installation, remove the camshaft housing sub-assembly LH, clean the installation surfaces, and reapply seal packing.

      • If the camshaft housing sub-assembly LH is removed because any of the bolts are loosened during installation, make sure that the previously applied seal packing does not enter any oil passages.

    4. A019JLWE02

      Tighten the 8 bolts in the order shown in the illustration.

      Torque:
      16 N*m  { 163 kgf*cm, 12 ft.*lbf }
  5. INSTALL CAMSHAFT


    1. Apply a light coat of engine oil to the camshaft journals and camshaft housing sub-assembly RH.

    2. Install the camshaft to the camshaft housing sub-assembly RH.

  6. INSTALL NO. 2 CAMSHAFT


    1. Apply a light coat of engine oil to the No. 2 camshaft journals and camshaft housing sub-assembly RH.

    2. Install the No. 2 camshaft to the camshaft housing sub-assembly RH.

  7. INSTALL CAMSHAFT BEARING CAP (for Bank 1)


    1. Apply engine oil to the camshaft bearing caps.

    2. A019OMR

      Make sure of the marks and numbers on the camshaft bearing caps and place them in each proper position and direction.

    3. A019N6XE01

      Temporarily tighten the 8 bearing cap bolts in the order shown in the illustration.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  8. INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY RH


    1. A019LN3E06
      Text in Illustration
      *1 Valve Rocker Arm
      *2 Lash Adjuster
      *3 Valve Stem
      *4 Valve Stem Cap

      Make sure that the No. 1 valve rocker arm sub-assembly is installed as shown in the illustration.

    2. A019M2XE08

      Apply seal packing in a continuous line as shown in the illustration.

      Seal packing
      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
      Standard seal diameter
      3.5 to 4.5 mm (0.138 to 0.177 in.)

      Note


      • Remove any oil from the contact surface.

      • Install the camshaft housing sub-assembly RH within 3 minutes.

      • Do not start the engine for at least 2 hours after installing.

    3. A019PLQE01

      Install the camshaft housing sub-assembly RH and tighten the 12 bolts in the order shown in the illustration.

      Torque:
      28 N*m  { 286 kgf*cm, 21 ft.*lbf }

      Note


      • When installing the camshaft housing RH, it is necessary to correctly position the camshafts as shown in the illustration.

        Failure to correctly position these parts may result in damage due to contact between the pistons and valves. If a camshaft is rotated with a piston at TDC, valve contact will occur.

      • If any of the bolts are loosened during installation, remove the camshaft housing sub-assembly RH, clean the installation surfaces, and reapply seal packing.

      • If the camshaft housing sub-assembly RH is removed because any of the bolts are loosened during installation, make sure that the previously applied seal packing does not enter any oil passages.

    4. A019PC0E02

      Tighten the 8 bolts in the order shown in the illustration.

      Torque:
      16 N*m  { 163 kgf*cm, 12 ft.*lbf }
  9. INSTALL NO. 3 CHAIN TENSIONER ASSEMBLY


    1. A019MGNE02

      Install the No. 3 chain tensioner assembly with the bolt.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    2. While pushing in the tensioner, insert a pin of 1.0 mm (0.0394 in.) diameter into the hole to hold it.

  10. INSTALL CAMSHAFT TIMING GEARS AND NO. 2 CHAIN (for Bank 2)


    1. A019KJJE08
      Text in Illustration
      *1 Timing Mark
      *2 Mark Plate

      Align the mark plates (yellow) with the timing marks of the camshaft timing gear assemblies as shown in the illustration.

    2. Apply a light coat of engine oil to the bolt threads and bolt-seating surface.

    3. Align the knock pin of the camshaft with the pin hole of the camshaft timing gear assembly. Install the camshaft timing gear assembly and camshaft timing exhaust gear LH with the No. 2 chain sub-assembly installed.

    4. A019OU8E02

      Using SST to hold the hexagonal portion of each camshaft, tighten the bolts of the camshaft timing gear assembly and the camshaft timing exhaust gear assembly.

      SST
      09922-10010
      Torque:
      100 N*m  { 1020 kgf*cm, 74 ft.*lbf }
    5. Remove the pin from the No. 3 chain tensioner assembly.

  11. INSTALL NO. 2 CHAIN TENSIONER ASSEMBLY


    1. A019MRQE02

      Install the No. 2 chain tensioner assembly with the bolt.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    2. While pushing in the No. 2 chain tensioner assembly, insert a pin of 1.0 mm (0.0394 in.) diameter into the hole to hold it.

  12. INSTALL CAMSHAFT TIMING GEARS AND NO. 2 CHAIN (for Bank 1)


    1. A019OO6E11
      Text in Illustration
      *1 Timing Mark
      *2 Mark Plate

      Align the mark plates (yellow) with the timing marks of the camshaft timing gear assemblies as shown in the illustration.

    2. Apply a light coat of engine oil to the bolt threads and bolt-seating surface.

    3. Align the knock pin of the camshaft with the pin hole of the camshaft timing gear assembly. Install the camshaft timing gear assembly and camshaft timing exhaust gear assembly with the No. 2 chain sub-assembly installed.

    4. A019JXNE02

      Using SST to hold the hexagonal portion of each camshaft, tighten the bolts of the camshaft timing gear assembly and the camshaft timing exhaust gear assembly.

      SST
      09922-10010
      Torque:
      100 N*m  { 1020 kgf*cm, 74 ft.*lbf }
    5. Remove the pin from the No. 2 chain tensioner assembly.

  13. INSTALL IDLE SPROCKET ASSEMBLY


    1. A019OZHE02
      Text in Illustration
      *1 Knock Pin

      Apply a light coat of engine oil to the rotating surface of the No. 1 idle gear shaft.

    2. Temporarily install the No. 1 idle gear shaft and idle sprocket with the No. 2 idle gear shaft while aligning the knock pin of the No. 1 idle gear shaft with the knock pin groove of the cylinder block.

      Note

      Be careful of the idle gear installation position.

      Tech Tips

      Check that no foreign objects are on the No. 1 and No. 2 idle gear shafts.

    3. Using a 10 mm hexagon wrench, tighten the No. 2 idle gear shaft.

      Torque:
      60 N*m  { 612 kgf*cm, 44 ft.*lbf }

      Tech Tips

      After installing the idle sprocket assembly, check that the idle sprocket turns smoothly.

  14. INSTALL CHAIN SUB-ASSEMBLY


    1. A019OCDE03
      Text in Illustration
      *1 Mark Plate
      *2 Timing Mark

      Align the mark plates and timing marks as shown in the illustration and install the chain.

      Tech Tips

      The camshaft mark plates are orange.

    2. A019LNR

      Do not pass the chain over the crankshaft, just temporarily place it on the crankshaft.

    3. A019NRRE09

      Turn the camshaft timing gear assembly on bank 1 counterclockwise to tighten the chain between the banks.

      Note

      When the idle sprocket assembly is reused, align the chain plate with the mark where the plate had been in order to tighten the chain between the banks.

    4. A019L2EE04
      Text in Illustration
      *1 Mark Plate
      *2 Timing Plate

      Align the mark plate and timing marks as shown in the illustration and install the chain onto the crankshaft timing sprocket.

      Tech Tips

      The crankshaft mark plate is yellow.

    5. Temporarily tighten the pulley set bolt.

    6. A019NZBE01
      Text in Illustration
      *1 Center Line
      *2 Timing Mark
      *3 Sensor Plate

      Turn the crankshaft clockwise to set it to the RH block bore center line (TDC/compression).

  15. INSTALL CHAIN TENSIONER SLIPPER


    1. Install the chain tensioner slipper.

  16. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY


    1. A019K8NE03
      Text in Illustration
      *1 Stopper Plate
      *2 Plunger

      Move the stopper plate upward to release the lock, and push the plunger deep into the tensioner.

    2. Move the stopper plate downward to set the lock, and insert a hexagon wrench into the hole of the stopper plate.

    3. A019OCS

      Install the No. 1 chain tensioner assembly with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    4. Remove the hexagon wrench from the No. 1 chain tensioner assembly.

  17. INSPECT VALVE TIMING


    1. Check the camshaft timing marks.

      Note


      • Check each timing mark from a viewpoint directly inline with the center of the camshaft and the timing mark on each camshaft timing gear.

      • If the timing marks are checked from any other viewpoint, the valve timing may appear misaligned.

    2. Check that each camshaft timing mark is positioned as shown in the illustration.

      A019O4JE01

      Tech Tips

      For the intake camshaft:

      Be sure to check mark A at the point when marks B, C, and D are positioned in line. If the marks are checked from any other viewpoint, they cannot be checked correctly.

      A019NP0E01
    3. If the valve timing is misaligned, reinstall the timing chain.

    4. Remove the pulley set bolt.

  18. INSTALL TIMING CHAIN CASE OIL SEAL


    1. A019OKQE04

      Using SST, tap in a new timing chain case oil seal until its surface is flush with the timing gear case edge.

      SST
      09223-22010
      09506-35010
      Oil seal tap in depth
      0 to 1.0 mm (0 to 0.0393)

      Note


      • Keep the lip free of foreign matter.

      • Do not tap on the oil seal at an angle.

      • Make sure that the oil seal edge does not stick out of the timing chain case.

  19. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY


    1. Apply seal packing in a continuous line to the engine unit as shown in the following illustration.

      A019LSNE09
      Seal packing
      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
      Seal diameter
      3.0 mm (0.118 in.)

      Note


      • Be sure to clean and degrease the contact surfaces, especially the surfaces indicated by C in the illustration.

      • If the contact surfaces are wet, wipe them with an oil-free cloth before applying seal packing.

      • Install the chain cover within 3 minutes.

      • Do not start the engine for at least 2 hours after installing.

    2. Apply seal packing in a continuous line to the timing chain cover as shown in the following illustration.

      A019JUME10
      Seal packing
      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
      Toyota Genuine Seal Packing 1282B, Three Bond 1282B or equivalent

      Note


      • If the contact surfaces are wet, wipe them with an oil-free cloth before applying seal packing.

      • Install the chain cover within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.

      • Do not start the engine for at least 2 hours after installing.

      Seal Packing Application Chart
      Area Seal Packing Diameter Application Position from Inside Seal Line
      Continuous Line Area 4.5 mm or more (0.177 in.) 3.0 to 4.0 mm (0.118 to 0.158 in.)
      Alternate Long and short Dashed Line Area 3.5 mm or more (0.138 in.) 2.0 to 3.0 mm (0.079 to 0.118 in.)
      Dashed Line Area 3.5 mm or more (0.138 in.) 3.0 to 4.0 mm (0.118 to 0.158 in.)
      Diagonal Line Area 6.0 mm or more (0.236 in.) 5.0 mm (0.197 in.)
    3. A019N1L

      Install a new gasket.

    4. A019PKHE06
      Text in Illustration
      *1 Drive Rotor Spline
      *2 Crankshaft

      Align the oil pump's drive rotor spline and the crankshaft as shown in the illustration. Install the spline and chain cover to the crankshaft.

    5. Temporarily tighten the timing chain cover with the 23 bolts and 2 nuts.

      A019PH5E06
      Bolt Length
      Item Length
      Bolt A 40 mm (1.57 in.)
      Bolt B 55 mm (2.17 in.)
      Bolt C 25 mm (0.98 in.)

      Note

      Make sure that there is no oil on the bolt and nut threads.

    6. Fully tighten the bolts in this order: Area 1 and Area 2.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    7. Fully tighten the bolts in Area 3.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }

      Tech Tips

      First tighten the upper bolts and nuts followed by lower bolts and nuts as shown in the illustration.

    8. Fully tighten the bolts in Area 4.

      Torque:
      Bolt A
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
      Torque:
      Except bolt A
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }

      Tech Tips

      Tighten the bolts in the order of lower to upper as shown in the illustration.

    9. Install a new chain cover plate gasket and the chain cover plate with the 4 bolts.

      Torque:
      9.1 N*m  { 93 kgf*cm, 81 in.*lbf }
  20. INSTALL WATER INLET HOUSING


    1. A019JNWE01

      Install 2 new O-rings.

      Tech Tips

      Apply a small amount of water or soapy water to O-ring (A) shown in the illustration before installation.

    2. A019P0QE02

      Install the 2 stud bolts.

      Torque:
      4.0 N*m  { 41 kgf*cm, 35 in.*lbf }
    3. A019NN5E03
      Text in Illustration
      *1 Nut
      *2 Bolt

      Install the water inlet housing with the 2 bolts and nut.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }

      Note

      Be careful that the O-ring does not get caught between the parts.

    4. Connect the No. 1 water by-pass hose.

    5. Apply adhesive around the drain cock.

      Adhesive
      Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
    6. Install the drain cock assembly to the water inlet housing.

      Torque:
      30 N*m  { 306 kgf*cm, 22 ft.*lbf }
    7. Install the drain cock plug to the drain cock assembly.

      Torque:
      13 N*m  { 130 kgf*cm, 9 ft.*lbf }
    8. Install a new gasket to the thermostat.

    9. A019NC5E01

      Align the thermostat jiggle valve with the upper stud bolt, and insert the thermostat in the water inlet housing.

      Tech Tips

      The jiggle valve may be set within 10° of either side of the prescribed position.

    10. A019KNL

      Install the water inlet with the 2 nuts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  21. INSTALL NO. 1 FRONT ENGINE MOUNTING BRACKET LH


    1. A019K15E02

      Using an E8 "TORX" socket wrench, install the 2 stud bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Install the No. 1 front engine mounting bracket LH with the 6 bolts.

      Torque:
      54 N*m  { 550 kgf*cm, 40 ft.*lbf }

      Note


      • Install the water inlet and mounting bracket within 15 minutes after installing the chain cover.

      • Do not start the engine for at least 2 hours after installation.

  22. INSTALL OIL PAN SUB-ASSEMBLY


    1. Using an E8 "TORX" socket wrench, install the 2 stud bolts.

      A019MJFE07
      Torque:
      Bolt A
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      Bolt B
      9.0 N*m  { 92 kgf*cm, 80 in.*lbf }
    2. A019L7R

      Install 2 new O-rings.

    3. A019NO1E05

      Apply seal packing in a continuous line as shown in the illustration.

      Seal packing
      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
      Seal diameter
      3.0 to 4.0 mm (0.118 to 0.157 in.)

      Note


      • Remove any oil from the contact surface.

      • Install the oil pan within 3 minutes after applying seal packing.

      • Do not start the engine for at least 2 hours after installing.

    4. A019M3AE01
      Text in Illustration
      *1 Nut

      Install the oil pan with the 16 bolts and 2 nuts.

      Torque:
      Bolts A
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      Except bolts A
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  23. INSTALL OIL STRAINER SUB-ASSEMBLY


    1. A019PK9E05

      Using an E6 "TORX" socket, install the 2 stud bolts as shown in the illustration.

      Torque:
      4.0 N*m  { 41 kgf*cm, 35 in.*lbf }
    2. A019MXTE02
      Text in Illustration
      *1 Nut

      Install a new gasket and the oil strainer sub-assembly with the bolt and 2 nuts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  24. INSTALL NO. 2 OIL PAN SUB-ASSEMBLY


    1. A019O0OE02

      Using an E6 "TORX" socket, install the 2 stud bolts as shown in the illustration.

      Torque:
      4.0 N*m  { 41 kgf*cm, 35 in.*lbf }
    2. A019LWDE04

      Apply seal packing in a continuous line as shown in the illustration.

      Seal packing
      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
      Seal diameter
      3.0 to 4.0 mm (0.118 to 0.157 in.)

      Note


      • Remove any oil from the contact surface.

      • Install the No. 2 oil pan sub-assembly within 3 minutes after applying seal packing.

      • Do not start the engine for at least 2 hours after installing.

    3. A019MZHE02
      Text in Illustration
      *1 Nut

      Install the No. 2 oil pan sub-assembly with the 16 bolts and 2 nuts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  25. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY


    1. A019LQ5E01

      Apply seal packing as shown in the illustration.

      Seal packing
      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

      Note


      • Remove any oil from the contact surface.

      • Install the head cover within 3 minutes after applying seal packing.

      • Do not start the engine for at least 2 hours after installing.

    2. A019N77

      Install 3 new gaskets as shown in the illustration.

    3. Install a new cylinder head cover gasket to the cylinder head cover sub-assembly.

    4. A019N8QE01

      Install the head cover with the 12 bolts and a new seal washer.

      Torque:
      Bolts A
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
      Except bolts A
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }

      Tech Tips

      After tightening all bolts, check the tightening torque of 1 and 11. Retighten the bolt if necessary.

  26. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH


    1. A019NXAE01

      Apply seal packing as shown in the illustration.

      Seal packing
      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

      Note


      • Remove any oil from the contact surfaces.

      • Install the cylinder head cover sub-assembly LH within 3 minutes after applying seal packing.

      • Do not start the engine for at least 2 hours after installing.

    2. A019KNZ

      Install 3 new gaskets as shown in the illustration.

    3. Install a new cylinder head cover gasket to the cylinder head cover sub-assembly LH.

    4. A019MR5E04

      Install the cylinder head cover sub-assembly LH with the 12 bolts and a new seal washer.

      Torque:
      Bolts A
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
      Except bolts A
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }

      Tech Tips

      After tightening all bolts, check the tightening torque of 1 and 10. Retighten the bolt if necessary.

  27. INSTALL CRANKSHAFT PULLEY


    1. A019KY0

      Align the pulley set key with the key groove of the pulley, and slide on the pulley.

    2. A019N80E01

      Using SST, install the pulley bolt.

      SST
      09213-70011   ( 09213-70020 )
      09330-00021
      Torque:
      250 N*m  { 2550 kgf*cm, 184 ft.*lbf }
  28. INSTALL NO. 1 OIL PIPE


    1. Make sure that there is no foreign matter on the mesh of the oil control valve filter LH.

      Note

      Do not touch the mesh when installing the oil control valve filter.

    2. A019JMNE02
      Text in Illustration
      *1 Oil Pipe Union

      Install the oil control valve filter LH to the oil pipe union. Install new gaskets and temporarily install the oil pipe (on the head cover side) with the union.

    3. Install a new gasket and temporarily install the oil pipe (on the cylinder head side) with the union.

    4. Tighten the oil pipe union (on the head cover side).

      Torque:
      65 N*m  { 663 kgf*cm, 48 ft.*lbf }
    5. Tighten the oil pipe union (on the cylinder head side).

      Torque:
      65 N*m  { 663 kgf*cm, 48 ft.*lbf }

      Note

      If the link that connects the gaskets is broken, remove the connecting link by using side cutters or a similar tool.

  29. INSTALL OIL PIPE


    1. Make sure that there is no foreign matter on the mesh of the oil control valve filter RH.

      Note

      Do not touch the mesh when installing the oil control valve filter.

    2. A019O2ME05
      Text in Illustration
      *1 Oil Pipe Union

      Install the oil control valve filter RH to the oil pipe union. Install new gaskets and temporarily install the oil pipe (on the head cover side) with the union.

    3. Install a new gasket and temporarily install the oil pipe (on the cylinder head side) with the union.

    4. Install the bolt (A) to the cylinder head.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    5. Tighten the oil pipe union (on the head cover side).

      Torque:
      65 N*m  { 663 kgf*cm, 48 ft.*lbf }
    6. Tighten the oil pipe union (on the cylinder head side).

      Torque:
      65 N*m  { 663 kgf*cm, 48 ft.*lbf }

      Note

      If the link that connects the gaskets is broken, remove the connecting link by using side cutters or a similar tool.

  30. INSTALL CRANK POSITION SENSOR


    1. A019KVKE03
      Text in Illustration
      *1 O-ring

      Apply a light coat of engine oil to the O-ring on the crank position sensor.

    2. A019L97

      Install the crank position sensor with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. Connect the crank position sensor connector.

  31. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY


    1. A019JLO

      Install the No. 1 vacuum switching valve assembly with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  32. INSTALL WATER PUMP PULLEY


    1. A019OHOE01

      Temporarily install the water pump pulley with the 4 bolts.

    2. Using SST, hold the water pump pulley.

      SST
      09960-10010   ( 09962-01000, 09963-00700 )
    3. Tighten the 4 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  33. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY


    1. A019OU1

      Install the idler pulley cover plate, No. 2 idler pulley sub-assembly and No. 2 idler pulley cover plate with the bolt.

      Torque:
      54 N*m  { 550 kgf*cm, 40 ft.*lbf }
  34. INSTALL NO. 2 TIMING GEAR COVER


    1. A019O7B

      Install the No. 2 timing gear cover with the 2 bolts.

      Torque:
      6.0 N*m  { 61 kgf*cm, 53 in.*lbf }
  35. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE


    1. A019LNN

      Apply a light coat of engine oil to a new O-ring and install it to the engine oil level dipstick guide.

    2. A019MTB

      Install the engine oil level dipstick guide.

  36. INSTALL NO. 1 OIL COOLER BRACKET


    1. A019NJLE03

      Using an E8 "TORX" socket, install the 2 stud bolts as shown in the illustration.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. A019P83E02
      Text in Illustration
      *1 Nut
      *2 Bolt

      Install a new gasket to the No. 1 oil cooler bracket.

    3. Install the oil cooler pipe with the bolt and 2 nuts.

      Torque:
      21 N*m  { 214 kgf*cm, 16 ft.*lbf }
    4. A019K3V

      Install a new gasket to the No. 1 oil pan.

    5. Install the No. 1 oil cooler bracket with oil cooler pipe with the 3 bolts and 3 nuts.

      Torque:
      21 N*m  { 214 kgf*cm, 16 ft.*lbf }
  37. INSTALL OIL COOLER ASSEMBLY


    1. A019KI8

      Install a new O-ring.

    2. Install the oil cooler assembly with the union bolt.

      Torque:
      68 N*m  { 693 kgf*cm, 50 ft.*lbf }
    3. A019KN7

      Install the 2 water by-pass hoses with the bolt, 2 clamps, and 4 clips.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  38. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY


    1. A019LV6E01

      Temporarily install the V-ribbed belt tensioner assembly with the 5 bolts.

      Tech Tips

      Each bolt length is as follows:

      A: 70 mm (2.76 in.)

      B: 33 mm (1.30 in.)

    2. Install the V-ribbed belt tensioner assembly by tightening the bolt 1 and bolt 2 in the order shown in the illustration.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
    3. Tighten the other bolts.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
  39. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH


    1. A019M93E01

      Install a new gasket as shown in the illustration.

    2. A019KC8E01

      Install the exhaust manifold sub-assembly LH with the 6 nuts in the order shown in the illustration.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  40. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR


    1. A019M53

      Install the No. 2 exhaust manifold heat insulator with the 3 bolts.

      Torque:
      8.5 N*m  { 87 kgf*cm, 75 in.*lbf }
    2. A019LV3

      Connect the sensor wire to the radiator pipe clamp.

    3. Connect the air fuel ratio sensor connector (for Bank 2 Sensor 1).

  41. INSTALL NO. 2 MANIFOLD STAY


    1. A019OEYE01

      Install the No. 2 manifold stay by tightening the bolt and nut in the order shown in the illustration.

      Torque:
      34 N*m  { 347 kgf*cm, 25 ft.*lbf }
  42. INSTALL NO. 2 ENGINE OIL LEVEL DIPSTICK GUIDE


    1. A019MI3

      Install a new O-ring to the No. 2 engine oil level dipstick guide.

    2. Apply a light coat of engine oil to the O-ring.

    3. Push in the No. 2 engine oil level dipstick guide end into the No. 1 engine oil level dipstick guide.

    4. A019PLI

      Install the No. 2 engine oil level dipstick guide with the bolt.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    5. Install the engine oil level dipstick.

  43. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH


    1. A019NOYE01

      Install a new gasket as shown in the illustration.

    2. A019JNCE01

      Install the exhaust manifold sub-assembly RH with the 6 nuts in the order shown in the illustration.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  44. INSTALL INTAKE MANIFOLD


    1. A019JMD

      Set the new No. 1 and No. 2 intake manifold to head gaskets on each cylinder head.

      Note


      • Align the port holes of the gasket and cylinder head.

      • Make sure that the gasket is installed in the correct direction.

    2. Set the intake manifold on the cylinder heads.

    3. Install and tighten the 6 bolts and 4 nuts uniformly in several steps.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    4. A019NZ1

      Install the fuel hose protector with the 2 bolts and nut.

      Torque:
      Bolt
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
      Nut
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  45. INSTALL NO. 2 ENGINE MOUNTING STAY RH


    1. A019L7Y

      Install the No. 2 engine mounting stay RH with the bolt.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  46. INSTALL IGNITION COIL ASSEMBLY


    1. A019JVQ

      Install the 6 ignition coils with the 6 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. A019M7R

      Connect the 6 ignition coil connectors.

    3. A019OM6

      Connect the 3 wire harness clamps.

  47. INSTALL THROTTLE BODY BRACKET


    1. A019OY3

      Install the throttle body bracket with the bolt.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  48. INSTALL NO. 1 SURGE TANK STAY


    1. A019NO0

      Install the No. 1 surge tank stay with the bolt.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  49. INSTALL INTAKE AIR SURGE TANK ASSEMBLY

    NOTICE
    DO NOT apply oil to the bolts listed below:
    Tightening Part
    Surge Tank and Intake Manifold
    No. 1 Surge Tank Stay and Surge Tank
    Throttle Body Bracket and Surge Tank

    1. Install 3 new air surge tank to intake manifold gaskets to the intake air surge tank.

    2. A019MTQ

      Using a 5 mm hexagon socket wrench, install the intake air surge tank assembly with the 4 bolts and 2 nuts.

      Torque:
      Bolt
      18 N*m  { 184 kgf*cm, 13 ft.*lbf }
      Nut
      16 N*m  { 163 kgf*cm, 12 ft.*lbf }
    3. A019NBS

      Install the throttle body bracket and No. 1 surge tank stay with the 2 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    4. A019KEL

      Connect the connector to the intake air control valve assembly.

    5. A019M0E

      Connect the ventilation hose and vacuum hose.

    6. A019MBG

      Connect the 2 water by-pass hoses to the throttle body assembly.

    7. A019N1A

      Connect the vacuum hose clamp and fuel vapor feed hose.

    8. A019JMB

      Connect the throttle body assembly connector and wire harness clamp to the throttle body assembly.

    9. A019KAPE01
      Text in Illustration
      *1 for RHD:
      *2 for LHD:

      Connect the union to check valve hose.

  50. INSTALL ENGINE HANGERS


    1. A019KKGE13
      Text in Illustration
      *1 No. 1 Engine Hanger
      *2 No. 2 Engine Hanger

      Install the No. 1 and No. 2 engine hangers with the 4 bolts as shown in the illustration.

      Part No.
      No. 1 engine hanger 12281-31120
      No. 2 engine hanger 12282-31100
      Bolts 91671-10825
      Torque:
      33 N*m  { 337 kgf*cm, 24 ft.*lbf }
    2. Attach the engine sling device and hang the engine with the chain block.

  51. REMOVE ENGINE STAND

  52. INSTALL DRIVE PLATE AND RING GEAR SUB-ASSEMBLY


    1. A019OAPE01

      Using SST, hold the crankshaft pulley.

      SST
      09213-70011   ( 09213-70020 )
      09330-00021
    2. Clean the 8 bolts and 8 bolt holes.

    3. A019N87

      Install the front drive plate spacer.

      Tech Tips

      Align the pin of the front drive plate spacer with the pin hole of the crankshaft.

    4. A019PG0E01

      Install the drive plate and ring gear sub-assembly and rear drive plate spacer onto the crankshaft.

    5. A019ME0E06
      Text in Illustration
      *1 Adhesive

      Apply adhesive to 2 or 3 threads of the 8 bolts.

      Adhesive
      Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
    6. A019KZPE01

      In several steps, uniformly install and tighten the 8 bolts in the sequence shown in the illustration.

      Torque:
      83 N*m  { 846 kgf*cm, 61 ft.*lbf }
  53. INSTALL AUTOMATIC TRANSAXLE ASSEMBLY

    Tech Tips

    See the steps from "Install Automatic Transaxle Assembly" through "Install Engine Assembly with Transaxle" Click here.