INSTALL DUTY VACUUM SWITCHING VALVE
Connect the hose to the duty vacuum switching valve and install the duty vacuum switching valve with the bolt.
Connect the duty vacuum switching valve connector and clamp.
Connect the 3 vacuum hoses and install the 3 vacuum hoses to the hose clamp.
INSTALL NO. 1 ENGINE UNDER COVER
INSTALL NO. 1 AIR CLEANER INLET
Install the No. 1 air cleaner inlet with the bolt.
Connect the vacuum hose clamp to the No. 1 air cleaner inlet.
INSTALL NO. 2 AIR CLEANER INLET
Install the No. 2 air cleaner inlet with the 2 bolts.
Connect the 2 vacuum hose clamps to the No. 2 air cleaner inlet.
INSTALL BATTERY
Install the battery and battery tray.
Install the battery clamp with the bolt and nut.
Connect the positive (+) cable to the positive (+) battery terminal.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.
INSTALL V-BANK COVER SUB-ASSEMBLY
Fit the 4 retainers and install the V-bank cover sub-assembly.
INSTALL COOL AIR INTAKE DUCT SEAL (for LHD)
Install the cool air intake duct seal with the 6 clips.
INSTALL COOL AIR INTAKE DUCT SEAL (for RHD)
Install the cool air intake duct seal with the 6 clips.
INSTALL ENGINE ROOM SIDE COVER LH (for LHD)
Engage the guide.
Install the engine room side cover LH with the 4 clips.
INSTALL ENGINE ROOM SIDE COVER LH (for RHD)
Engage the guide.
Install the engine room side cover LH with the 4 clips.
INSTALL ENGINE ROOM SIDE COVER (for LHD)
Engage the guide.
Install the engine room side cover with the 4 clips.
INSTALL ENGINE ROOM SIDE COVER (for RHD)
Engage the guide.
Install the engine room side cover with the 4 clips.