UPPER INSTRUMENT PANEL INSTALLATION

PROCEDURE


  1. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY


    1. Install the instrument panel sub-assembly with the 7 screws and 2 bolts.

  2. INSTALL INSTRUMENT PANEL PASSENGER AIRBAG ASSEMBLY


    1. A004J0T

      Install the instrument panel passenger airbag assembly with the 2 bolts.

      Torque:
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
    2. Connect the passenger airbag connector.

    3. Engage the clamp.

  3. INSTALL AUTOMATIC LIGHT CONTROL SENSOR (w/ Automatic Light Control System)

    Click here

  4. INSTALL INSTRUMENT PANEL ORNAMENT


    1. Engage the 3 claws and 3 clips and install the instrument panel ornament.

  5. INSTALL COMBINATION METER ASSEMBLY

    Click here

  6. INSTALL FRONT PILLAR GARNISH LH


    1. Remove the protective cover (w/curtain shield airbag).

    2. Make sure that the front pillar garnish clip is not damaged.

      Note

      If there is any damage, replace the front pillar garnish clip with a new one.

    3. A004JPVE01
      Text in Illustration
      *1 Front Pillar Garnish Clip

      Hook the tip of the front pillar garnish clip on the front pillar garnish LH as shown in the illustration.

    4. Turn the front pillar garnish LH in the direction of the arrow.

    5. A004K47E03
      Text in Illustration
      *1 Front Pillar Garnish Clip

      Insert the 2 guides in the direction of the arrow (1).

    6. Engage the 2 clips and the front pillar garnish clip in the direction of the arrow, and install the front pillar garnish LH.

  7. INSTALL FRONT PILLAR GARNISH RH

    Tech Tips

    Use the same procedure as for the LH side.

  8. INSTALL FRONT NO. 2 SPEAKER ASSEMBLY (for 6 Speakers)

    Click here

  9. INSTALL NO. 2 INSTRUMENT PANEL SPEAKER PANEL SUB-ASSEMBLY


    1. Connect connector.

    2. Engage the 6 claws to install the No. 2 instrument panel speaker panel sub-assembly.

  10. INSTALL FRONT NO. 2 SPEAKER ASSEMBLY (for 6 Speakers)

    Click here

  11. INSTALL NO. 1 INSTRUMENT PANEL SPEAKER PANEL SUB-ASSEMBLY

    Tech Tips

    Use the same procedure as for the LH side.

  12. INSTALL LOWER INSTRUMENT PANEL SUB-ASSEMBLY

    Click here

  13. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    6.0 N*m  { 61 kgf*cm, 53 in.*lbf }
  14. CHECK SRS WARNING LIGHT

    Click here