STEERING PAD SWITCH INSTALLATION

PROCEDURE


  1. INSTALL STEERING PAD SWITCH ASSEMBLY


    1. Engage the 4 claws to install the steering pad switch assembly.

    2. Install the 2 screws.

    3. Pass the wire harness over the 2 guides.

    4. Connect the steering pad switch connector to the spiral cable sub-assembly.

  2. INSTALL HORN BUTTON ASSEMBLY

    Click here

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    6.0 N*m  { 61 kgf*cm, 53 in.*lbf }
  4. INSPECT SRS WARNING LIGHT

    Click here