VALVE BODY ASSEMBLY REASSEMBLY

PROCEDURE


  1. INSTALL SHIFT SOLENOID VALVE S3


    1. A004JM7

      Install the shift solenoid valve S3 with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  2. INSTALL SHIFT SOLENOID VALVE S2


    1. A004K32

      Install the shift solenoid valve S2 with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  3. INSTALL SHIFT SOLENOID VALVE S1


    1. A004JVI

      Install the shift solenoid valve S1.

  4. INSTALL SHIFT SOLENOID VALVE S4


    1. A004IMD

      Install the valve body wire harness clamp, shift solenoid valve S4 with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  5. INSTALL SHIFT SOLENOID VALVE SR


    1. A004IA0

      Install the shift solenoid valve SR with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  6. INSTALL SHIFT SOLENOID VALVE SL1


    1. A004IGN

      Install the shift solenoid valve SL1.

  7. INSTALL SHIFT SOLENOID VALVE SLT


    1. A004KO0

      Install the shift solenoid valve SLT.

    2. Install the 2 straight pins and lock plate with the bolt.

      Torque:
      6.4 N*m  { 65 kgf*cm, 57 in.*lbf }
  8. INSTALL SHIFT SOLENOID VALVE SLU


    1. A004KTU

      Install the shift solenoid valve SLU.

  9. INSTALL SHIFT SOLENOID VALVE SL2


    1. A004I3R

      Install the shift solenoid valve SL2.

    2. Install the 2 straight pins and lock plate with the bolt.

      Torque:
      6.4 N*m  { 65 kgf*cm, 57 in.*lbf }