DESCRIPTION
The skid control ECU assembly is connected to the combination meter assembly via CAN communication.
WIRING DIAGRAM
Refer to ABS Warning Light Remains ON Click here.
INSPECTION PROCEDURE
Note
When replacing the skid control ECU assembly, perform initialization and calibration of the linear solenoid valve Click here.
PROCEDURE
CHECK CAN COMMUNICATION SYSTEM
Check if a CAN communication system DTC is output (for LHD: Click here, for RHD: Click here.
| Result | ||||||||
|---|---|---|---|---|---|---|---|---|
|
| B |
|
INSPECT CAN COMMUNICATION SYSTEM Click here |
| C |
|
INSPECT CAN COMMUNICATION SYSTEM Click here |
| A |
|
CHECK ABS WARNING LIGHT
Disconnect the skid control ECU assembly connectors.
Turn the power switch on (IG).
Check that the ABS warning light comes on.
| OK |
|---|
| The ABS warning light comes on. |
Tech Tips
If troubleshooting has been carried out according to Problem Symptoms Table, refer back to the table and proceed to the next step before replacing the part Click here.
| NG |
|
INSPECT COMBINATION METER ASSEMBLY Click here |
| OK |
|
REPLACE SKID CONTROL ECU ASSEMBLY Click here
INSPECT COMBINATION METER ASSEMBLY
Turn the power switch off.
Reconnect the skid control ECU assembly connectors.
Perform the Active Test of the combination meter assembly (meter CPU) using the GTS Click here.
Check the combination meter assembly.
| OK |
|---|
| The ABS warning light turns on or off in accordance with the GTS operation. |
Tech Tips
If troubleshooting has been carried out according to Problem Symptoms Table, refer back to the table and proceed to the next step Click here.
| NG |
|
REPLACE COMBINATION METER ASSEMBLY Click here |
| OK |
|
REPLACE SKID CONTROL ECU ASSEMBLY Click here