DESCRIPTION
The skid control ECU assembly outputs a stop light operation signal to the No. 2 integration relay and the No. 2 integration relay illuminates the stop lights.
| DTC Code | DTC Detection Condition | Trouble Area |
|---|---|---|
| C1A4B | When the skid control ECU assembly detects a problem with the stop light control relay, a wire harness or a connector, the skid control ECU assembly sends a malfunction flag to the driving support ECU via CAN communication. When the driving support ECU receives the malfunction flag, DTC C1A48 is stored. |
|
WIRING DIAGRAM
Refer to the wiring diagram for DTC C1380/64 Click here.
INSPECTION PROCEDURE
Note
When replacing the skid control ECU assembly, perform initialization and calibration of the linear solenoid valve Click here.
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
Tech Tips
When C1249/49 is output together with C1380/64, inspect and repair the trouble areas indicated by C1249/49 first Click here.
PROCEDURE
CHECK STOP LIGHT OPERATION
Check that the stop lights come on when the brake pedal is depressed and go off when the brake pedal is released.
| OK | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY POWER SOURCE TERMINAL) Click here |
| OK |
|
READ VALUE USING GTS (STOP LIGHT SWITCH)
Connect the GTS to the DLC3.
Turn the power switch on (IG).
Select the Data List on the GTS Click here.
| Tester Display | Measurement Item/Range | Normal Condition | Diagnostic Note |
|---|---|---|---|
| Stop Light SW | Stop light switch / ON or OFF | ON: Brake pedal depressed OFF: Brake pedal released |
- |
Check that the stop light switch condition observed on the GTS changes according to brake pedal operation.
| OK |
|---|
| The GTS displays ON or OFF according to brake pedal operation. |
| NG |
|
CHECK HARNESS AND CONNECTOR (STP TERMINAL) Click here |
| OK |
|
PERFORM ACTIVE TEST USING GTS (NO. 2 INTEGRATION RELAY)
Select the Active Test on the GTS Click here.
| Tester Display | Test Part | Control Range | Diagnostic Note |
|---|---|---|---|
| Stop Light Relay | No. 2 integration relay | Relay ON / OFF | Stop lights come on |
| EBS Relay | No. 2 integration relay (Emergency brake signal) |
Relay ON / OFF | No change* |
*: w/o Emergency Brake Signal
Perform the Active Test of the No. 2 integration relay using the GTS.
Select the Data List on the GTS Click here.
| Tester Display | Measurement Item/Range | Normal Condition | Diagnostic Note |
|---|---|---|---|
| Stop Light Relay Output | No. 2 integration relay output / ON or OFF | ON: Relay output on OFF: Relay output off |
- |
| EBS Relay | No. 2 integration relay (Emergency brake signal) / ON or OFF | OFF: Always*1 ON: Relay on*2 OFF: Relay off*2 |
- |
*1: w/o Emergency Brake Signal
*2: w/ Emergency Brake Signal
Check for No. 2 integration relay operation using the Data List and stop light operation by performing an Active Test.
| Result | Proceed to |
|---|---|
| Data List content and stop light operation are normal | A |
| Data List content is normal but stop lights do not turn on or off | B |
| B |
|
CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - SKID CONTROL ECU ASSEMBLY) Click here |
| A |
|
CHECK HARNESS AND CONNECTOR (STP2 TERMINAL)
| *a | Front view of wire harness connector (to Skid Control ECU Assembly) |
Turn the power switch off.
Make sure that there is no looseness at the locking part and the connecting part of the connector.
Disconnect the skid control ECU assembly connector.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (STP2 CIRCUIT) |
| OK |
|
RECONFIRM DTC
Reconnect the skid control ECU assembly connector.
Clear the DTCs Click here.
Turn the power switch on (Ready).
Perform a road test.
Check if the same DTC is recorded Click here.
| Result | Proceed to |
|---|---|
| DTC C1380/64 is not output | A |
| DTC C1380/64 is output | B |
| B |
|
REPLACE SKID CONTROL ECU ASSEMBLY Click here |
| A |
|
CHECK FOR INTERMITTENT PROBLEMS Click here
CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY POWER SOURCE TERMINAL)
| *a | Front view of wire harness connector (to No. 2 Integration Relay) |
Turn the power switch off.
Disconnect the No. 2 integration relay connectors.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (SKID CONTROL ECU - STOP LIGHT CONTROL RELAY)
| *a | Front view of wire harness connector (to No. 2 Integration Relay) |
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||||
|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - SKID CONTROL ECU ASSEMBLY)
Make sure that there is no looseness at the locking part and the connecting part of the connector.
Disconnect the A14 skid control ECU assembly connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
REPLACE NO. 2 INTEGRATION RELAY
Reconnect the No. 2 integration relay connector.
| *A | w/ Emergency Brake Signal |
| *a | Front view of wire harness connector (to Skid Control ECU Assembly) |
Disconnect the A16 skid control ECU assembly connector.
Connect the terminals of the A16 connector of the skid control ECU assembly and check the stop light operating condition.
Note
Make sure to connect the terminals of the connector to the correct locations as not doing so may damage the connector.
| Standard | ||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| w/o Emergency Brake Signal | ||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
| w/ Emergency Brake Signal | ||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
| NG |
|
REPLACE NO. 2 INTEGRATION RELAY Click here |
| OK |
|
REPLACE SKID CONTROL ECU ASSEMBLY Click here
CHECK HARNESS AND CONNECTOR (STP TERMINAL)
| *a | Front view of wire harness connector (to Skid Control ECU Assembly) |
Turn the power switch off.
Make sure that there is no looseness at the locking part and the connecting part of the connector.
Disconnect the skid control ECU assembly connector.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Result | Proceed to |
|---|---|
| NG | A |
| OK (for LHD) | B |
| OK (for RHD) | C |
| B |
|
CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - SKID CONTROL ECU ASSEMBLY) Click here |
| C |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| A |
|
REPLACE SKID CONTROL ECU ASSEMBLY Click here
CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - SKID CONTROL ECU ASSEMBLY)
Turn the power switch off.
Make sure that there is no looseness at the locking part and the connecting part of the connector.
Disconnect the A16 skid control ECU assembly connector.
Disconnect the 1A No. 2 integration relay connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
*: w/ Emergency Brake Signal
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
INSPECT NO. 2 INTEGRATION RELAY
| *A | w/ Emergency Brake Signal |
| *a | Front view of wire harness connector (to Skid Control ECU Assembly) |
Reconnect the No. 2 integration relay connector.
Connect the terminals of the A16 connector of the skid control ECU assembly and check the stop light operating condition.
Note
Make sure to connect the terminals of the connector to the correct locations as not doing so may damage the connector.
| Standard | ||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| w/o Emergency Brake Signal | ||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
| w/ Emergency Brake Signal | ||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
| NG |
|
REPLACE NO. 2 INTEGRATION RELAY Click here |
| OK |
|
REPLACE SKID CONTROL ECU ASSEMBLY Click here
CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - SKID CONTROL ECU ASSEMBLY)
Disconnect the 1A No. 2 integration relay connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS AND CONNECTOR |
| OK |
|
REPLACE NO. 2 INTEGRATION RELAY
Temporarily replace the No. 2 integration relay with a new or normally functioning one Click here.
| NEXT |
|
CHECK FOR DTC
Clear the DTCs Click here.
Check for DTCs Click here.
| OK |
|---|
| DTC C1A4B is not output. |
Note
When replacing the driving support ECU, always replace it with a new one and be sure to perform initialization Click here. If an ECU which was installed to another vehicle is used, the information stored in the ECU will not match the information from the vehicle, and as a result, a DTC may be stored.
| NG |
|
REPLACE DRIVING SUPPORT ECU Click here |
| OK |
|
END (NO. 2 INTEGRATION RELAY WAS DEFECTIVE)