DESCRIPTION
If the power switch is on (IG), the power management control ECU applies current to the MREL terminal to turn the IGCT relay on. This supplies power to the +B1 and +B2 terminals.
INSPECTION PROCEDURE
PROCEDURE
CHECK POWER MANAGEMENT CONTROL ECU (+B1, +B2 VOLTAGE)
Turn the power switch on (IG).
| *a | Component with harness connected (Power Management Control ECU) |
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
Turn the power switch off.
| NG |
|
CHECK POWER MANAGEMENT CONTROL ECU (MREL VOLTAGE) Click here |
| OK |
|
CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - BODY GROUND)
Disconnect the connector from the power management control ECU.
| *a | Rear view of wire harness connector (to Power Management Control ECU) |
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Connect the power management control ECU connectors.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Click here
CHECK POWER MANAGEMENT CONTROL ECU (MREL VOLTAGE)
Turn the power switch on (IG).
| *a | Component with harness connected (Power Management Control ECU) |
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
Turn the power switch off.
| NG |
|
REPLACE POWER MANAGEMENT CONTROL ECU Click here |
| OK |
|
CHECK FUSE (IGCT NO. 5)
| *1 | No. 1 Engine Room Relay Block and Junction Block Assembly |
| *2 | IGCT No. 5 Fuse |
Remove the IGCT No. 5 fuse from the No. 1 engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Install the IGCT No. 5 fuse.
| NG |
|
CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 1 ENGINE ROOM RELAY BLOCK AND JUNCTION BLOCK ASSEMBLY) Click here |
| OK |
|
CHECK FUSE (IGCT NO. 1)
| *1 | No. 1 Engine Room Relay Block and Junction Block Assembly |
| *2 | IGCT No. 1 Fuse |
Remove the IGCT No. 1 fuse from the No. 1 engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Install the IGCT No. 1 fuse.
| NG |
|
CHECK HARNESS AND CONNECTOR (NO. 1 ENGINE ROOM RELAY BLOCK AND JUNCTION BLOCK ASSEMBLY) Click here |
| OK |
|
INSPECT RELAY (IGCT)
Remove the IGCT relay from the No. 1 engine room relay block and junction block assembly.
| *1 | IGCT Relay |
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
Install the IGCT relay.
| NG |
|
REPLACE RELAY (IGCT) |
| OK |
|
CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 1 ENGINE ROOM RELAY BLOCK AND JUNCTION BLOCK ASSEMBLY)
| *1 | No. 1 Engine Room Relay Block and Junction Block Assembly |
| *2 | IGCT No. 5 Fuse |
Remove the IGCT No. 5 fuse from the No. 1 engine room relay block and junction block assembly.
Disconnect the connector from the power management control ECU.
Measure the resistance according to the value(s) in the table below.
| *1 | No. 1 Engine Room Relay Block and Junction Block Assembly | *2 | IGCT No. 5 Fuse |
| *a | Rear view of wire harness connector (to Power Management Control ECU) |
- | - |
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
Install the IGCT No. 5 fuse.
Connect the power management control ECU connectors.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 1 ENGINE ROOM RELAY BLOCK AND JUNCTION BLOCK ASSEMBLY)
| *1 | No. 1 Engine Room Relay Block and Junction Block Assembly |
| *2 | IGCT No. 1 Fuse |
| *3 | IGCT No. 5 Fuse |
| *4 | IGCT Relay |
Remove the IGCT No. 1 fuse, IGCT No. 5 fuse and IGCT relay from the No. 1 engine room relay block and junction block assembly.
| *1 | No. 1 Engine Room Relay Block and Junction Block Assembly |
| *2 | IGCT No. 1 Fuse |
| *3 | IGCT No. 5 Fuse |
| *4 | IGCT Relay |
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
Install the IGCT No. 1 fuse, IGCT No. 5 fuse and IGCT relay.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 1 ENGINE ROOM RELAY BLOCK AND JUNCTION BLOCK ASSEMBLY)
Remove the IGCT relay from the No. 1 engine room relay block and junction block assembly.
Disconnect the connector from the power management control ECU.
Measure the resistance according to the value(s) in the table below.
| *1 | No. 1 Engine Room Relay Block and Junction Block Assembly | *2 | IGCT Relay |
| *a | Rear view of wire harness connector (to Power Management Control ECU) |
- | - |
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
Install the IGCT relay.
Connect the power management control ECU connectors.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 1 ENGINE ROOM RELAY BLOCK AND JUNCTION BLOCK ASSEMBLY - BODY GROUND)
| *1 | No. 1 Engine Room Relay Block and Junction Block Assembly |
| *2 | IGCT Relay |
Remove the IGCT relay from the No. 1 engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Install the IGCT relay.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 1 ENGINE ROOM RELAY BLOCK AND JUNCTION BLOCK ASSEMBLY)
| *1 | No. 1 Engine Room Relay Block and Junction Block Assembly |
| *2 | AMD Terminal |
| *3 | IGCT No. 1 Fuse |
Disconnect the inverter bus-bar plate sub-assembly from the AMD terminal (No. 1 engine room relay block and junction block assembly side).
Remove the IGCT No. 1 fuse from the No. 1 engine room relay block and junction block assembly.
| *A | for LHD |
| *B | for RHD |
| *1 | No. 1 Engine Room Relay Block and Junction Block Assembly |
| *2 | IGCT No. 1 Fuse |
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
||||||
|
Install the IGCT No. 1 fuse.
Connect the AMD terminal.
| NG |
|
| OK |
|
CHECK FOR INTERMITTENT PROBLEMS Click here
CHECK FUSIBLE LINK BLOCK ASSEMBLY (DC / DC)
Check the fusible link block assembly (DC/DC) in the No. 1 engine room relay block and junction block assembly for improper installation.
| OK |
|---|
| The fusible link is installed securely. |
Remove the fusible link block assembly from the No. 1 engine room relay block and junction block assembly.
| *1 | Fusible Link Block Assembly |
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Install the fusible link block assembly.
| NG |
|
REPLACE FUSIBLE LINK BLOCK ASSEMBLY (DC / DC) |
| OK |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR
CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 1 ENGINE ROOM RELAY BLOCK AND JUNCTION BLOCK ASSEMBLY)
| *1 | No. 1 Engine Room Relay Block and Junction Block Assembly |
| *2 | IGCT No. 5 Fuse |
Remove the IGCT No. 5 fuse from the No. 1 engine room relay block and junction block assembly.
Disconnect connector F65 from the shift lever position sensor.
Disconnect the connectors from the power management control ECU.
Measure the resistance according to the value(s) in the table below.
| *1 | No. 1 Engine Room Relay Block and Junction Block Assembly | *2 | IGCT No. 5 Fuse |
| *a | Rear view of wire harness connector (to Power Management Control ECU) |
- | - |
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
Install the IGCT No. 5 fuse.
Connect the shift lever position sensor connector.
Connect the power management control ECU connectors.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR Click here |
| OK |
|
REPLACE FUSE (IGCT NO. 5)
REPAIR OR REPLACE HARNESS OR CONNECTOR
| NEXT |
|
REPLACE FUSE (IGCT NO. 5)
CHECK HARNESS AND CONNECTOR (NO. 1 ENGINE ROOM RELAY BLOCK AND JUNCTION BLOCK ASSEMBLY)
| *1 | No. 1 Engine Room Relay Block and Junction Block Assembly |
| *2 | IGCT No. 1 Fuse |
| *3 | IGCT No. 5 Fuse |
| *4 | IGCT Relay |
Remove the IGCT No. 1 fuse, IGCT No. 5 fuse and IGCT relay from the No. 1 engine room relay block and junction block assembly.
| *1 | No. 1 Engine Room Relay Block and Junction Block Assembly |
| *2 | IGCT No. 1 Fuse |
| *3 | IGCT No. 5 Fuse |
| *4 | IGCT Relay |
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
Install the IGCT No. 1 fuse, IGCT No. 5 fuse and IGCT relay.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR Click here |
| OK |
|
REPLACE FUSE (IGCT NO. 1)
REPAIR OR REPLACE HARNESS OR CONNECTOR
| NEXT |
|
REPLACE FUSE (IGCT NO. 1)