PURGE VALVE INSTALLATION


  1. INSTALL PURGE VSV


    1. Install the purge VSV with the bolt.

      Torque:
      18 N*m  { 184 kgf*cm, 13 ft.*lbf }
    2. Connect the 2 purge line hoses.

    3. Connect the purge VSV connector.

  2. INSTALL V-BANK COVER SUB-ASSEMBLY


    1. A01FTDYE01
      Text in Illustration
      *1 Tip (Round Portion)

      Attach the 3 clips in the order shown in the illustration to install the V-bank cover.

      Note


      • Securely attach the clips.

      • If the clips are forcibly attached or struck with an object, they may be damaged.

      • Do not apply any oil to the tips (round portions).