CANISTER (w/ Canister Pump Module) INSTALLATION


  1. INSTALL CANISTER PUMP MODULE


    1. A01FHBJ

      Engage the 2 claws to install a new canister pump module to the canister.

      Note


      • Do not allow foreign matter such as grease, oil or water to adhere to the O-rings.

      • Ensure that the claws are engaged properly.

  2. INSTALL CHARCOAL CANISTER BASE BRACKET


    1. Engage the claw to install the charcoal canister base bracket.

  3. INSTALL CHARCOAL CANISTER ASSEMBLY


    1. Install the charcoal canister assembly with the 3 nuts.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
    2. Connect the 2 quick connectors, purge line hose and connector.

    3. Connect the wire harness with the 3 clamps.

  4. INSTALL REAR NO. 1 FLOOR BOARD SUB-ASSEMBLY


    1. Install the rear No. 1 floor board with the 6 clips and 4 grommets.