DESCRIPTION
When the engine switch is turned on (IG), the battery voltage is applied to terminal IGSW of the ECM. The ECM MREL output signal causes a current to flow to the coil, closing the contacts of the No. 1 integration relay (EFI MAIN1 relay) and supplying power to terminal +B and +B2 of the ECM.
If the engine switch is turned off, the ECM holds the No. 1 integration relay (EFI MAIN1 relay) ON for a maximum of 2 seconds to allow for the initial setting of the throttle valve.
When the engine switch is turned on (IG), voltage from the ECM's MREL terminal is applied to the No. 1 integration relay (EFI MAIN1 relay). This causes the contacts of the No. 1 integration relay (EFI MAIN1 relay) to close, which supplies power to terminal +B and +B2 of the ECM.
WIRING DIAGRAM
INSPECTION PROCEDURE
Note
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
PROCEDURE
INSPECT ECM (+B, +B2 VOLTAGE)
| *a | Component with harness connected (ECM) |
Turn the engine switch on (IG).
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND) Click here |
| OK |
|
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Click here
CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | ||||||
|---|---|---|---|---|---|---|
|
Reconnect the ECM connector.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (ECM - BODY GROUND) |
| OK |
|
INSPECT ECM (IGSW VOLTAGE)
| *a | Component with harness connected (ECM) |
Turn the engine switch on (IG).
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
INSPECT NO. 1 INTEGRATION RELAY (IG2 RELAY) Click here |
| OK |
|
INSPECT ECM (MREL VOLTAGE)
| *a | Component with harness connected (ECM) |
Turn the engine switch on (IG).
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPLACE ECM Click here |
| OK |
|
INSPECT NO. 1 INTEGRATION RELAY (EFI MAIN1 RELAY)
Inspect the No. 1 integration relay Click here.
| NG |
|
REPLACE NO. 1 INTEGRATION RELAY |
| OK |
|
CHECK HARNESS AND CONNECTOR (EFI MAIN1 RELAY - ECM)
Remove the No. 1 integration relay from the No. 2 engine room relay block.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | ||||||
|---|---|---|---|---|---|---|
|
| Standard Resistance (Check for Short) | ||||||
|---|---|---|---|---|---|---|
|
Reconnect the ECM connector.
Reinstall the No. 1 integration relay.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (EFI MAIN1 RELAY - ECM) |
| OK |
|
CHECK HARNESS AND CONNECTOR (EFI MAIN1 RELAY - ECM)
Remove the No. 1 integration relay from the No. 2 engine room relay block.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Standard Resistance (Check for Short) | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
Reinstall the No. 1 integration relay.
Reconnect the ECM connector.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (EFI MAIN1 RELAY - ECM) |
| OK |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - NO. 1 INTEGRATION RELAY)
INSPECT NO. 1 INTEGRATION RELAY (IG2 RELAY)
Inspect the No. 1 integration relay Click here.
| NG |
|
REPLACE NO. 1 INTEGRATION RELAY |
| OK |
|
CHECK HARNESS AND CONNECTOR (ECM - IG2 RELAY, BODY GROUND)
Check the harness and the connectors between the No. 1 integration relay and the ECM.
Remove the No. 1 integration relay from the No. 2 engine room relay block.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | ||||||
|---|---|---|---|---|---|---|
|
| Standard Resistance (Check for Short) | ||||||
|---|---|---|---|---|---|---|
|
Reconnect the ECM connector.
Check the harness and the connectors between the No. 1 integration relay and body ground.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | ||||||
|---|---|---|---|---|---|---|
|
Reinstall the No. 1 integration relay.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (ECM - IG2 RELAY, BODY GROUND) |
| OK |
|
CHECK NO. 1 INTEGRATION RELAY (POWER SOURCE)
| *a | Front view of wire harness connector to No. 1 Integration Relay |
Remove the No. 1 integration relay from the No. 2 engine room relay block.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
Reinstall the No. 1 integration relay.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
GO TO SMART ACCESS SYSTEM WITH PUSH-BUTTON START Click here