AUTOMATIC HEADLIGHT BEAM LEVEL CONTROL SYSTEM Indicator Circuit

DESCRIPTION

The headlight beam level control system indicator light in the combination meter assembly comes on for approximately 3 seconds when the ignition switch is turned to ON. The indicator light also comes on when the headlight leveling ECU assembly detects a malfunction.

WIRING DIAGRAM

A01EU4KE02

INSPECTION PROCEDURE

PROCEDURE


  1. CHECK HEADLIGHT LEVELING ECU ASSEMBLY (INPUT SIGNAL)


    1. A01EU07E04
      Text in Illustration
      *a

      Front view of wire harness connector

      (to Headlight Leveling ECU Assembly)

      Disconnect the A34 headlight leveling ECU assembly connector.

    2. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Switch Condition Specified Condition
      A34-6 (WNG) - Body ground Ignition switch ON 11 to 14 V
      Ignition switch off Below 1 V

    NG
    OK
  2. CHECK HARNESS AND CONNECTOR (COMBINATION METER ASSEMBLY - HEADLIGHT LEVELING ECU ASSEMBLY)


    1. Disconnect the I18 combination meter assembly connector.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      A34-6 (WNG) - I18-12 (LVWG) Always Below 1 Ω
      A34-6 (WNG) - Body ground Always 10 kΩ or higher

    NG
    OK