МАСЛЯНЫЙ НАСОС УСТАНОВКА


  1. INSTALL OIL PUMP ASSEMBLY


    1. Install the oil pump with the 3 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 16 ft.*lbf }
  2. INSTALL NO. 2 OIL PAN SUB-ASSEMBLY


    1. Remove any old packing material and be careful not to drop any oil on the contact surfaces of the cylinder block and oil pan.

    2. A003XJ5E11
      Text in Illustration
      *1 Seal Packing

      Apply a continuous bead of seal packing (diameter 4.0 mm (0.157 in.)) as shown in the illustration.

      Seal packing
      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

      Note


      • Remove any oil from the contact surfaces.

      • Install the oil pan within 3 minutes of applying seal packing.

      • Do not start the engine for at least 2 hours after installing the oil pan.

    3. Install the No. 2 oil pan with the 10 bolts and 2 nuts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  3. INSTALL OIL PAN DRAIN PLUG


    1. A003Z4J

      Установите новую прокладку и пробку сливного отверстия.

      Torque:
      37 Н*м  { 377 кгс*см, 27 фунт-сила-футов }
  4. INSTALL CRANKSHAFT TIMING GEAR KEY


    1. A003YXH

      Пластмассовым молотком запрессуйте 2 шпонки ведущего зубчатого колеса коленчатого вала.

      Tech Tips

      Запрессуйте шпонки ведущего зубчатого колеса коленчатого вала так, чтобы они касались коленчатого вала, как показано на рисунке.

  5. INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE


    1. A003V61

      Установите зубчатый диск датчика положения коленчатого вала так, чтобы метка "F" была обращена вперед.

  6. INSTALL NO. 2 CHAIN SUB-ASSEMBLY


    1. Temporarily install the crankshaft pulley bolt.

    2. A003WD7

      Turn the crankshaft counterclockwise to position the timing gear key at the 9 o'clock position.

    3. Turn the drive shaft so that the cutout faces the 12 o'clock position.

    4. A003XIGE02
      Text in Illustration
      *1 Front
      *2 Mark Plate (Yellow)
      *3 Timing Mark
      *4 Oil Pump Drive Gear
      *5 Oil Pump Drive Shaft Gear

      Align the yellow mark links with the timing marks of each gear as shown in the illustration.

      Tech Tips

      Be sure to position the mark plates at the front of the engine.

    5. Install the sprockets onto the crankshaft and oil pump shaft with the chain on the gears.

    6. Temporarily tighten the oil pump drive shaft gear with the nut.

    7. Insert the damper spring into the adjusting hole, and then install the chain tensioner plate with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    8. Temporarily tighten the crankshaft pulley with the bolt.

    9. A003YZ8E02

      Using SST, install the oil pump drive shaft gear nut while holding the crankshaft pulley.

      SST
      09213-58014   ( 91551-80840 )
      09330-00021
      Torque:
      28 N*m  { 286 kgf*cm, 21 ft.*lbf }
    10. Remove the crankshaft pulley and bolt.

  7. INSTALL CRANKSHAFT TIMING SPROCKET


    1. Install the crankshaft timing sprocket.

  8. INSTALL NO. 1 CHAIN VIBRATION DAMPER


    1. Install the chain vibration damper with the 2 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  9. SET NO. 1 CYLINDER TO TDC / COMPRESSION


    1. A003VC4E01
      Text in Illustration
      *1 Timing Gear Key

      Temporarily install the crankshaft pulley bolt.

    2. Turn the crankshaft to position the timing gear key to the top.

    3. A003V4DE01
      Text in Illustration
      *1 Timing Mark (Rectangle)
      *2 Timing Mark
      *3 Mark (Circle)

      Check that the timing marks on the camshaft timing gear and camshaft timing sprocket are aligned as shown in the illustration.

      Tech Tips

      There are 3 marks on the camshaft timing sprocket. Make sure that the timing mark (rectangle) is at the top.

    4. Remove the crankshaft pulley bolt.

  10. INSTALL CHAIN SUB-ASSEMBLY


    1. A003YQ2E01
      Text in Illustration
      *1 Mark Plate (Orange)
      *2 Timing Mark (Rectangle)
      *3 Mark (Circle)
      *a Place the Chain on the Sprocket
      *b Pass the Chain through the Damper

      Align the mark plate (orange) with the timing mark as shown in the illustration and install the chain.

      Tech Tips


      • There are 3 marks on the camshaft timing sprocket. Make sure to align the mark plate with the timing mark (rectangle).

      • Be sure to position the mark plate at the front of the engine.

      • The mark plate on the camshaft side is colored orange.

      • Do not pass the chain around the sprocket of the camshaft timing gear. Only place it on the sprocket.

      • Pass the chain through the No. 1 vibration damper.

    2. A003Y6X

      Place the chain on the crankshaft without passing it around the shaft.

    3. A003XHFE04
      Text in Illustration
      *1 Mark Plate (Orange)
      *2 Timing Mark
      *a Tension the Chain

      Hold the hexagonal portion of the camshaft with a wrench and turn the camshaft timing gear counterclockwise to align the mark plate (orange) and timing mark, and then install the chain.

    4. Hold the hexagonal portion of the camshaft with a wrench and turn the camshaft timing gear clockwise.

      Tech Tips

      To tension the chain, slowly turn the camshaft timing gear clockwise to prevent the chain from being misaligned.

    5. A003WSJE06
      Text in Illustration
      *1 Mark Plate (Yellow or Pink)
      *2 Timing Mark

      Align the mark plate (yellow or pink) and timing mark and install the chain to the crankshaft timing gear.

      Tech Tips

      The mark plate on the crankshaft side is colored pink.

  11. CHECK NO. 1 CYLINDER TO TDC / COMPRESSION


    1. Check each timing mark at TDC/compression.

      A003ZKCE01
      Text in Illustration
      *1 Timing Mark *2 Mark Plate (Orange)
      *3 Mark Plate (Yellow or Pink) *4 Timing Mark (Rectangle)
      *5 Mark (Circle) - -

      Tech Tips

      There are 3 marks on the camshaft timing sprocket. Make sure that the timing mark (rectangle) is at the top.

  12. INSTALL CHAIN TENSIONER SLIPPER


    1. Install the chain tensioner slipper to the cylinder block.

  13. INSTALL NO. 2 CHAIN VIBRATION DAMPER


    1. Install the No. 2 chain vibration damper with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  14. INSTALL TIMING CHAIN COVER OIL SEAL


    1. A003VX3E01

      Using SST and a hammer, tap in a new oil seal until its surface is flush with the timing chain cover edge.

      SST
      09223-22010

      Note


      • Keep the lip free from foreign matter.

      • Do not tap on the oil seal at an angle.

      • Make sure that the oil seal edge does not stick out of the timing chain case.

      Tech Tips

      Tap in the oil seal so that it is positioned within 1.0 mm (0.0394 in.) from the edge of the timing chain case.

    2. Apply MP grease to the lip of the oil seal.

  15. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY


    1. Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the timing chain cover, cylinder head and cylinder block.

      A003XSHE02
      Text in Illustration
      *a Clean and degrease - -
    2. A003XNX

      Install 3 new O-rings.

    3. Apply seal packing as shown in the illustration.

      A003XQPE01
      Seal packing
      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
      Seal diameter
      5.0 mm (0.197 in.)

      Note


      • Remove any oil from the contact surfaces.

      • Install the chain cover within 3 minutes of applying seal packing.

      • Do not start the engine for at least 2 hours after installing the timing chain cover sub-assembly.

    4. Apply seal packing to the timing chain cover in a line as shown in the following illustration.

      Note


      • When the contact surfaces are wet, wipe them with an oil-free cloth before applying seal packing.

      • Install the chain cover within 3 minutes and tighten the bolts within 15 minutes of applying seal packing.

      • Do not start the engine for at least 2 hours after installation.

      A003ZDGE02
      Seal Packing
      Item Seal Packing
      Dashed line Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
      Continuous line
      Alternate long and short dashed line Toyota Genuine Seal Packing 1282B, Three Bond 1282B or equivalent
      Application Specification
      Area Seal Packing Diameter Distance from Edge of Cover to: Seal Packing Application Length Distance from Top of Cover to Top of Seal Packing
      Dashed line 2.5 to 3.0 mm (0.0984 to 0.118 in.)

      Center of seal packing

      2.5 mm (0.0984 in.)

      - -
      Continuous line 4.5 to 5.5 mm (0.177 to 0.217 in.) or 7.0 to 8.0 mm (0.276 to 0.315 in.) - - -
      Alternate long and short dashed line 4.0 mm (0.157 in.)

      Center of seal packing

      3.0 mm (0.118 in.)

      - -
      A - A 2.5 to 3.5 mm (0.0984 to 0.138 in.)

      Center of seal packing

      2.5 mm (0.0984 in.)

      - -
      B - B 4.5 to 5.5 mm (0.177 to 0.217 in.)

      Opposite edge of seal packing

      5.0 mm (0.197 in.)

      - -
      C - C 7.0 to 8.0 mm (0.276 to 0.315 in.)

      Opposite edge of seal packing

      7.5 mm (0.295 in.)

      - -
      F 4.5 to 5.5 mm (0.177 to 0.217 in.) - 15.5 mm (0.610 in.) 50.4 mm (1.98 in.)
      G 4.5 to 5.5 mm (0.177 to 0.217 in.) - 10.3 mm (0.406 in.) 143.1 mm (5.63 in.)
      H 7.0 to 8.0 mm (0.276 to 0.315 in.) - 19.5 mm (0.768 in.) 153.4 mm (6.04 in.)
      I 4.5 to 5.5 mm (0.177 to 0.217 in.) - 16.0 mm (0.630 in.) 385.8 mm (1.27 ft.)
      J 4.5 to 5.5 mm (0.177 to 0.217 in.) - 18.6 mm (0.732 in.) 51.4 mm (2.02 in.)
      K 4.5 to 5.5 mm (0.177 to 0.217 in.) - 25.3 mm (0.996 in.) 121.9 mm (4.80 in.)
      L 7.0 to 8.0 mm (0.276 to 0.315 in.) - 25.8 mm (1.02 in.) 147.2 mm (5.80 in.)
      M 4.5 to 5.5 mm (0.177 to 0.217 in.) - 5.1 mm (0.201 in.) 173.0 mm (6.81 in.)
      N 4.5 to 5.5 mm (0.177 to 0.217 in.) - 14.6 mm (0.575 in.) 385.8 mm (1.27 ft.)
      O 4.0 mm (0.157 in.)

      Center of seal packing

      3.0 mm (0.118 in.)

      - -

      Note


      • When the contact surfaces are wet, wipe them with an oil-free cloth before applying seal packing.

      • Install the timing chain cover within 3 minutes and tighten the bolts within 10 minutes of applying seal packing.

      • After applying seal packing to the timing chain cover, install the engine mounting bracket and oil filter bracket within 10 minutes.

      • Do not add engine oil for at least 2 hours after installation.

    5. Clean the bolt and fitting hole.

    6. Install the timing chain cover.

    7. Temporarily tighten the engine mounting bracket RH with the 3 bolts.

      Note


      • Install the mounting bracket within 10 minutes of installing the chain cover.

      • Do not start the engine for at least 2 hours after installation.

      Bolt Length
      Item Length
      Bolt 80 mm (3.15 in.)
    8. Install 2 new O-rings.

    9. Temporarily tighten the oil filter bracket with the 4 bolts.

      Note


      • Install the oil filter bracket within 10 minutes of installing the chain cover.

      • Do not start the engine for at least 2 hours after installation.

      Bolt Length
      Item Length
      Bolt 35 mm (1.38 in.)
    10. Install the timing chain cover with the 25 bolts and seal washer as shown in the illustration.

      A003WHME03
      Text in Illustration
      *1 Seal Washer - -
      *a Torque *b Bolt Torque Order
      Torque:
      Bolt A, E, F
      26 N*m  { 260 kgf*cm, 19 ft.*lbf }
      Bolt B, C
      51 N*m  { 520 kgf*cm, 38 ft.*lbf }
      Bolt D
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }

      Note


      • Apply adhesive 1324 to the threads of the bolt F.

      • When the contact surfaces are wet, wipe them with an oil-free cloth before applying seal packing.

      • Install the chain cover within 3 minutes and tighten the bolts within 15 minutes of applying the seal packing.

      • Do not add engine oil for at least 2 hours after installing the chain cover.

      • Do not start the engine for at least 2 hours after installing the chain cover.

      Bolt Length
      Item Length
      Bolt A, F 35 mm (1.38 in.)
      Bolt B 55 mm (2.16 in.)
      Bolt C 80 mm (3.15 in.)
      Bolt D 40 mm (1.57 in.)
      Bolt E 55 mm (2.16 in.)
  16. INSTALL CRANKSHAFT PULLEY


    1. Совместите шпонку шкива со шпоночной канавкой шкива.

    2. Установите шкив коленчатого вала на коленчатый вал.

    3. A003WI4E02
      Обозначения на рисунке
      *a Удерживайте
      *b Поверните

      С помощью SST зафиксируйте шкив на месте и затяните болт.

      SST
      09213-58014   ( 91551-80840 )
      09330-00021
      Torque:
      190 Н*м  { 1937 кгс*см, 140 фунт-сила-футов }
  17. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY


    1. A003WT3E02
      Text in Illustration
      *1 Cam
      *2 Pin
      *3 Hook
      *a Push
      *b Raise
      *c CORRECT
      *d INCORRECT

      Release the cam, and then fully push in the plunger and engage the hook to the pin so that the plunger is in the position shown in the illustration.

      Note

      Make sure that the cam engages the first tooth of the plunger to allow the hook to pass over the pin.

    2. A003YIX

      Install a new gasket, the bracket and chain tensioner with the 2 nuts.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }

      Note

      If the hook releases the plunger while the chain tensioner is being installed, set the hook again.

    3. A003YPPE02
      Text in Illustration
      *1 Pin
      *2 Hook
      *a Push
      *b Turn
      *c Disconnect

      Rotate the crankshaft counterclockwise slightly and check that the hook is released.

    4. A003XL9E02
      Text in Illustration
      *1 Plunger
      *a Turn
      *b Plunger Extended

      Turn the crankshaft clockwise and check that the plunger is extended.

  18. INSTALL SPARK PLUG TUBE GASKET


    1. A003ZM8E04

      Резцом срежьте уплотнительную часть снятой прокладки.

      Обозначения на рисунке
      A003YGT Срезная часть
    2. A003W17E02
      Обозначения на рисунке
      *1 Прокладка трубки свечного колодца без уплотнения
      *2 Новая прокладка трубки свечного колодца

      С помощью молотка и прокладки трубки свечного колодца со срезанным уплотнением равномерно запрессуйте новую прокладку трубки свечного колодца.

      Note


      • Не допускайте попадания на кромку посторонних частиц.

      • Не следует запрессовывать прокладку трубки свечного колодца.

      Tech Tips

      Если прокладка трубки свечного колодца, которая используется для установки новой прокладки, деформирована и ее не удается поместить на новую прокладку, устраните деформацию плоскогубцами.

    3. Установите захваты отражающей вентиляционной заслонки в исходные положения.

  19. INSTALL CYLINDER HEAD COVER GASKET


    1. A003Z30E01
      Обозначения на рисунке
      *1 Крышка головки блока цилиндров
      *2 Прокладка крышки головки блока цилиндров

      Установите новую прокладку крышки головки блока цилиндров.

      Note


      • Удалите все масло с контактной поверхности.

      • Отклонение центра ребра крышки головки блока цилиндров от центра выступа прокладки головки блока цилиндров должно находиться в пределах 4,0 мм (0,157 дюйма).

  20. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY


    1. A003XE0

      Установите 2 новых прокладки на крышки подшипников распредвала.

    2. A003V4N

      Нанесите герметик, как показано на рисунке.

      Герметик
      Фирменный герметик Seal Packing Black от компании Toyota, Three bond 1207B или аналогичный
      Номинальный диаметр
      4,0 мм (0,157 дюйма)

      Note


      • Удалите все масло с контактной поверхности.

      • После нанесения герметика в течение 3 мин установите крышку головки блока цилиндров в сборе и в течение 15 мин затяните болты.

      • Не запускайте двигатель в течение 2 часов после установки.

    3. A003VEM
      Обозначения на рисунке
      *1 Крышка цепного привода газораспределительного механизма
      *2 Кожух распредвала
      *3 Прокладка крышки головки блока цилиндров

      Установите крышку головки блока цилиндров с новой уплотнительной прокладкой и закрепите 13 болтами.

      Torque:
      10 Н*м  { 102 кгс*см, 7 фунт-сила-футов }

      Note

      Отклонение контактных поверхностей крышки цепного привода газораспределительного механизма и кожуха распредвала от центра выступа прокладки головки блока цилиндров должно находиться в пределах 4,0 мм (0,157 дюйма).

      A003ZPPE01
  21. INSTALL IGNITION COIL ASSEMBLY


    1. Установите 4 катушки зажигания и закрепите их 4 болтами.

      Torque:
      10 Н*м  { 102 кгс*см, 7 фунт-сила-футов }

      Note

      При установке катушек зажигания соблюдайте осторожность, чтобы не повредить наконечники свечей зажигания о края отверстия в крышке головки блока цилиндров или верхнюю кромку трубки свечного колодца.

    2. Подсоедините разъемы 4 катушек зажигания.

  22. INSTALL FUEL INJECTOR ASSEMBLY


    1. A003ZRFE06
      Text in Illustration
      *1 O-ring
      *2 Injector Vibration Insulator

      Install a new injector vibration insulator and O-ring to each fuel injector assembly.

    2. Apply a light coat of gasoline or spindle oil to the contact surfaces of the new O-ring on each fuel injector assembly.

    3. A003XO4

      While turning the fuel injector assembly left and right, install it onto the fuel delivery pipe sub-assembly.

      Note


      • Do not damage the fuel injector assembly or O-ring.

      • Do not twist the O-ring.

      • After installing each fuel injector, check that it turns smoothly. If not, replace the O-ring with a new one.

  23. INSTALL NO. 1 DELIVERY PIPE SPACER


    1. A003ZQPE01
      Text in Illustration
      *a Delivery Pipe Side
      *b Cylinder Head Side

      Install the 2 No. 1 delivery pipe spacers onto the cylinder head.

      Note

      Install the No. 1 delivery pipe spacers in the correct direction.

  24. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY


    1. A003Z7A

      Install the fuel delivery pipe sub-assembly with the 4 fuel injector assemblies and install the 2 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }

      Note


      • Do not drop the fuel injectors when installing the fuel delivery pipe sub-assembly.

      • Check that the fuel injector assemblies rotate smoothly after installing the fuel delivery pipe sub-assembly.

    2. A003WKH

      Install the bolt to secure the fuel delivery pipe sub-assembly.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  25. INSTALL FUEL VAPOR FEED PIPE


    1. Install the fuel vapor feed pipe with the bolt.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  26. INSTALL INTAKE MANIFOLD


    1. Install a new No. 1 intake manifold to head gasket to the intake manifold.

    2. A003VFZ

      Install the intake manifold with the 2 bolts and 2 nuts.

      Torque:
      28 N*m  { 286 kgf*cm, 21 ft.*lbf }
    3. A003VBE

      Connect the fuel vapor feed hose and ventilation hose.

    4. Install a new O-ring to the engine oil level dipstick guide sub-assembly.

    5. Apply a light coat of engine oil to the O-ring.

    6. A003XWAE01

      Install the engine oil level dipstick guide sub-assembly with the 2 bolts and connect the wire harness clamp.

      Torque:
      Bolt (A)
      28 N*m  { 286 kgf*cm, 21 ft.*lbf }
      Bolt (B)
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    7. Install the engine oil level dipstick.

    8. A003ZLL

      Connect the 2 wire harness clamps and 3 connectors.

    9. A003ZUX

      Install a new gasket and the surge tank cover with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    10. A003WQ0

      Install the wire harness support with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    11. A003WJV

      Connect the 2 wire harness clamps.

  27. INSTALL WATER BY-PASS PIPE


    1. Install the water by-pass pipe with the 2 bolts and nut.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    2. Connect the 2 water hoses.

  28. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE


    1. Apply a light coat of engine oil to a new O-ring.

    2. Install the O-ring to the engine oil level dipstick guide.

    3. A003ZA1E01

      Install the engine oil level dipstick guide with the 2 bolts.

      Torque:
      Bolt A
      28 N*m  { 286 kgf*cm, 21 ft.*lbf }
      Bolt B
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    4. Connect the clamp to the engine oil level dipstick guide.

    5. Install the oil dipstick.

  29. INSTALL THROTTLE BODY ASSEMBLY


    1. Установите на впускной коллектор новую прокладку.

    2. Установите корпус дроссельной заслонки в сборе и закрепите 2 болтами и 2 гайками.

      Torque:
      10 Н*м  { 102 кгс*см, 7 фунт-сила-футов }
    3. Подсоедините 2 перепускных шланга охлаждающей жидкости и разъем корпуса дроссельной заслонки.

  30. INSTALL ENGINE HANGERS


    1. A003X6R

      Install the 2 engine hangers with the 2 bolts.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
      Part Name Part No.
      No. 1 engine hanger 12281-37021
      No. 2 engine hanger 12282-37011
      Bolt 91552-81050
  31. REMOVE ENGINE STAND


    1. Remove the engine from the engine stand.

  32. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE

    Click here