AIR CONDITIONING PANEL(for Automatic Air Conditioning System) INSTALLATION

PROCEDURE


  1. INSTALL AIR CONDITIONING CONTROL ASSEMBLY


    1. Connect the 2 connectors, clamp and the cooler air hose.

    2. Engage the 4 clips and install the air conditioner control assembly.

  2. INSTALL RADIO RECEIVER ASSEMBLY WITH BRACKET (w/ Radio Receiver)

    Click here

  3. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (w/o Radio Receiver)

    Click here

  4. INSTALL UPPER INSTRUMENT CENTER CLUSTER FINISH PANEL

    Click here

  5. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY

    Click here

  6. INSTALL NO. 2 METER HOOD CLUSTER

    Click here

  7. INSTALL NO. 1 METER HOOD CLUSTER

    Click here