BLOWER RESISTOR INSTALLATION

PROCEDURE


  1. INSTALL FRONT BLOWER RESISTOR


    1. Install the front blower resistor with the 2 screws.

    2. Connect the connector.

  2. REMOVE NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for RHD)

  3. REMOVE NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for LHD)