GENERATOR INSTALLATION

PROCEDURE


  1. INSTALL GENERATOR ASSEMBLY


    1. A005JPQ

      Install the generator assembly with the bolt.

      Torque:
      54 N*m  { 551 kgf*cm, 40 ft.*lbf }
    2. A005I0KE02

      Install the piping clamp with the bolt A and screw B.

      Torque:
      Bolt A
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    3. A005GIM

      Install the bolt.

      Torque:
      19 N*m  { 194 kgf*cm, 14 ft.*lbf }
    4. Connect the connector and engage the clamp.

    5. Install the wire harness to terminal B with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    6. Install the terminal cap.

  2. INSTALL FAN AND GENERATOR V BELT

    Click here

  3. INSTALL ENGINE UNDER COVER RH

    Click here

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    5.4 N*m  { 55 kgf*cm, 48 in.*lbf }

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.