POWER MANAGEMENT CONTROL ECU INSTALLATION

PROCEDURE


  1. INSTALL POWER MANAGEMENT CONTROL ECU


    1. Install the power management control ECU with the nut.

      Torque:
      8.4 N*m  { 86 kgf*cm, 74 in.*lbf }
    2. Connect the 2 connectors.

  2. INSTALL INSTRUMENT PANEL UNDER TRAY (for LHD)

    Click here

  3. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for LHD)

    Click here

  4. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for RHD with Rear Fog Light)

    Click here

  5. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY (for RHD)

    Click here