OIL COOLER INSTALLATION

PROCEDURE


  1. INSTALL TRANSMISSION OIL COOLER


    1. Apply Toyota genuine CVT Fluid TC to the 2 new O-rings and install them on the transmission oil cooler.

    2. Install the transmission oil cooler onto the CVT with the 3 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  2. INSTALL WATER BY-PASS HOSE ASSEMBLY


    1. A005H9LE01
      Text in Illustration
      *1 Yellow Paint Mark

      Install the 2 water by-pass hoses to the transmission oil cooler with the 2 clamps.

      Note


      • Make sure the pinching portion of each clip is facing the direction shown in the illustration and the paint marks are aligned as shown in the illustration.

      • Securely push the hoses over each pipe fitting on the transmission oil cooler until the hoses contact the rib on each pipe fitting.

  3. ADD ENGINE COOLANT

    Click here

  4. INSPECT FOR ENGINE COOLANT LEAK

    Click here

  5. ADJUST CONTINUOUSLY VARIABLE TRANSAXLE FLUID

    Click here

  6. INSTALL ENGINE UNDER COVER LH

    Click here