TRANSMISSION CONTROL CABLE INSTALLATION

PROCEDURE


  1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY


    1. Install the transmission control cable assembly with the 3 nuts.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    2. Fix the transmission control cable assembly onto the transmission control cable bracket with a new clip.

    3. Install the transmission control cable assembly onto the control shaft lever with the nut.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
  2. INSTALL FRONT NO. 2 FLOOR HEAT INSULATOR

    A005JU2E01
    Text in Illustration
    *a Front Mark

    1. Install the No. 2 floor heat insulator with the 2 bolts and nut.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
  3. INSTALL FRONT EXHAUST PIPE ASSEMBLY

    Click here

  4. INSTALL BATTERY CARRIER

    Click here

  5. INSTALL BATTERY TRAY

    Click here

  6. INSTALL BATTERY

    Click here

  7. INSTALL SHIFT LOCK CONTROL UNIT ASSEMBLY

    Click here

  8. INSPECT FOR EXHAUST GAS LEAK