PARK / NEUTRAL POSITION SWITCH INSTALLATION

PROCEDURE


  1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY


    1. Temporarily install the park/neutral position switch assembly with the 2 bolts.

    2. Install the nut and a new nut stopper.

      Torque:
      6.9 N*m  { 70 kgf*cm, 61 in.*lbf }
    3. A005LDZE01
      Text in Illustration
      *a P Position
      *b R Position
      *c N Position

      Temporarily install the transmission control shaft lever, rotate it clockwise until it stops, rotate it counterclockwise for 2 notches to the N position, and then remove the transmission control shaft lever.

    4. A005L7EE02
      Text in Illustration
      *a Neutral Reference Line
      *b Nut Stopper Protrusion

      Align the neutral reference line with the protrusion on the nut stopper and fully tighten the 2 bolts.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    5. Bend the tabs of the nut stopper with a screwdriver.

    6. Install the transmission control shaft lever and spring washer, and tighten the nut.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
    7. Connect the park/neutral position switch connector.

  2. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY


    1. Install the transmission control cable assembly onto the No. 1 transmission control cable bracket with a new clip.

    2. Install the transmission control cable assembly onto the transmission control shaft lever with the nut.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
  3. INSTALL BATTERY CARRIER

    Click here

  4. INSTALL BATTERY TRAY

    Click here

  5. INSTALL BATTERY

    Click here

  6. INSPECT SHIFT LEVER POSITION

    Click here

  7. ADJUST SHIFT LEVER POSITION

    Click here

  8. INSPECT PARK/NEUTRAL POSITION SWITCH OPERATION

    Click here