PARK / NEUTRAL POSITION SWITCH INSTALLATION

PROCEDURE


  1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY


    1. Install the park/neutral position switch assembly to the continuously variable transaxle.

    2. Temporarily install the 2 bolts.

    3. A005JFO

      Install a new lock plate and the lock nut to the park/neutral position switch assembly.

      Torque:
      6.9 N*m  { 70 kgf*cm, 61 in.*lbf }
    4. Temporarily install the control shaft lever.

    5. A005H36E02

      Turn the lever clockwise until it stops, and then turn it counterclockwise 2 notches.

    6. Remove the control shaft lever.

    7. A005I3UE03

      Align the protrusion with the neutral basic line.

    8. Hold the switch in that position and tighten the 2 bolts.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
      Text in Illustration
      *a Neutral Basic Line
      *b Protrusion
    9. A005IPPE02
      Text in Illustration
      *1 Lock Plate

      Using a screwdriver, bend the tabs of the lock plate.

    10. Install the control shaft lever with the spring washer and nut.

      Torque:
      13 N*m  { 130 kgf*cm, 9 ft.*lbf }
    11. Connect the park/neutral position switch connector.

  2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY


    1. Install the transmission control cable assembly to the No. 1 transmission control cable bracket with a new clip.

    2. Connect the transmission control cable to the control shaft lever with the nut.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
  3. INSPECT SHIFT LEVER POSITION

    Click here

  4. ADJUST SHIFT LEVER POSITION

    Click here

  5. INSTALL AIR CLEANER ASSEMBLY

    Click here

  6. INSTALL BATTERY CARRIER

    Click here

  7. INSTALL BATTERY TRAY

    Click here

  8. INSTALL BATTERY

    Click here

  9. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY

    Click here