BACK-UP LIGHT SWITCH INSPECTION

PROCEDURE


  1. INSPECT BACK-UP LIGHT SWITCH ASSEMBLY

    A005GQLE03
    Text in Illustration
    *1 1.1 mm (0.043 in.)
    *2 Ohmmeter
    *a

    Component without harness connected

    (Back-up Light Switch Assembly)


    1. Measure the resistance of the back-up light switch assembly.

      Standard Resistance
      Tester Connection Switch Condition Specified Condition
      1 - 2 Pushed Below 1 Ω
      1 - 2 Released 10 kΩ or higher

      If the result is not as specified, replace the back-up light switch assembly.