ENGINE STOP AND START ECU INSTALLATION

PROCEDURE


  1. INSTALL ENGINE STOP AND START ECU


    1. Install the engine stop and start ECU with the 2 nuts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    2. Connect the 3 connectors.

  2. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY

    Click here

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  4. REGISTER NUMBER OF STARTER OPERATIONS

    Click here