ENGINE STOP AND START ECU INSTALLATION

PROCEDURE


  1. INSTALL ENGINE STOP AND START ECU


    1. Install the engine stop and start ECU with the 2 nuts.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
    2. Connect the 2 connectors.

  2. INSTALL INSTRUMENT PANEL UNDER TRAY

    Click here

  3. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

    Click here

  4. REGISTER NUMBER OF STARTER OPERATIONS

    Click here