WATER PUMP INSTALLATION

PROCEDURE


  1. INSTALL WATER PUMP ASSEMBLY


    1. A005M45E02

      Install a new gasket and the water pump assembly to the timing chain cover sub-assembly with the 6 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
      Bolt Length
      Item Length
      Bolt A 40 mm (1.57 in.)
      Bolt B 25 mm (0.98 in.)
  2. INSTALL ENGINE MOUNTING INSULATOR SUB-ASSEMBLY RH

    Click here

  3. INSTALL GENERATOR ASSEMBLY

    Click here

  4. ADD ENGINE COOLANT

    Click here

  5. INSPECT FOR ENGINE COOLANT LEAK

    Click here